Phase 2, at Fall River Skatepark

Recent signers:
Bronwyn Wiesner and 19 others have signed recently.

The Issue

  1. Achieve Phase 2 at Gordon R. Snow Community centre (Fall River Skatepark)
  2. Add street section, quarter pipes, vert ramps and/or resurface skatepark. 

This park has holes and cracks it’s always filled with kids, has potential hazards. It’s over 13 years old and has never been resurfaced.

*Possible location for new street section is towards the three tree section towards the building’s gymnasium and back towards the 45 degree Hip. 
(somewhat shown in right side of photo near high vert quarterpipe)

Please sign below we need your support to make this happen!  

Thank you in advance for your consideration. 

 

avatar of the starter
Aron TinneyPetition Starter��

402

Recent signers:
Bronwyn Wiesner and 19 others have signed recently.

The Issue

  1. Achieve Phase 2 at Gordon R. Snow Community centre (Fall River Skatepark)
  2. Add street section, quarter pipes, vert ramps and/or resurface skatepark. 

This park has holes and cracks it’s always filled with kids, has potential hazards. It’s over 13 years old and has never been resurfaced.

*Possible location for new street section is towards the three tree section towards the building’s gymnasium and back towards the 45 degree Hip. 
(somewhat shown in right side of photo near high vert quarterpipe)

Please sign below we need your support to make this happen!  

Thank you in advance for your consideration. 

 

avatar of the starter
Aron TinneyPetition Starter��
Petition updates
Share this petition
Petition created on July 28, 2021