Stop the Industrial Energy & Data Hub in Kilmeaden - Protect Our Village

The Issue

Waterford City & County Council is considering a massive planning application (Ref: 2560625) on the former cheese factory site in Kilmeaden, covering 108 hectares.

The plan is presented as a “mixed use village centre,” but while it does include a small supermarket, apartments, childcare and community facilities, these are dwarfed by the industrial-scale elements:

 

Plan

 

  • 3 huge ICT/data centre buildings (24,033 m² each, 19.8m high, with flues up to 25m).
  • An energy centre with 16 gas turbines, 7 generators, and stacks almost 30m high.
  • 2 large warehouses and multiple ancillary plant buildings.
  • A solar farm with 43,056 panels and a 6,682 m² battery energy storage compound.
  • A new access road and bridge, 441 car parking spaces, and HGV traffic flows.

This scale is utterly inappropriate for a rural village and will:

  • Create noise, vibration, and air emissions harmful to residents
  • Cause light pollution and solar glare, impacting homes and road safety.
  • Increase traffic and congestion, especially on the R680 and R681.
  • Damage Kilmeaden’s rural character, biodiversity, and landscape.
  • Lock us into fossil fuels with 16 gas turbines for decades.

Kilmeaden needs development at a village scale, not to be redefined as an industrial energy and data hub.

We call on Waterford City & County Council to:

  • Refuse permission for planning application 2560625 in its entirety.
  • Protect Kilmeaden’s community, environment, and heritage.

How you can make the difference:

✍️ Please sign and share this petition to make your voice heard. Together, we can protect Kilmeaden for future generations.

⚠️ Most importantly, please also lodge your personal objection with Waterford City & County Council before the deadline of 12th October.

You can do this by:

  • 📧 Emailing your objection (with your name, address, phone number, and the planning reference 2560625) to:planning@waterfordcouncil.ie
    (The planning office will phone you for the €20 statutory fee.)
  • 🌐 Online: via the ePlanning Portal,
  • ✉️ By Post: to the Planning Department, Menapia Building, The Mall, Waterford
  • 🏢 In Person: at the Planning Office (Menapia Building, The Mall, Waterford)

📄To make it easy, we’ve created an Objection Pack with:

  • Step-by-step guide
  • Short objection letter template
  • Comprehensive objection letter template

👉 Download the full pack here:  Kilmeaden Objection Pack (Google Drive)

459

The Issue

Waterford City & County Council is considering a massive planning application (Ref: 2560625) on the former cheese factory site in Kilmeaden, covering 108 hectares.

The plan is presented as a “mixed use village centre,” but while it does include a small supermarket, apartments, childcare and community facilities, these are dwarfed by the industrial-scale elements:

 

Plan

 

  • 3 huge ICT/data centre buildings (24,033 m² each, 19.8m high, with flues up to 25m).
  • An energy centre with 16 gas turbines, 7 generators, and stacks almost 30m high.
  • 2 large warehouses and multiple ancillary plant buildings.
  • A solar farm with 43,056 panels and a 6,682 m² battery energy storage compound.
  • A new access road and bridge, 441 car parking spaces, and HGV traffic flows.

This scale is utterly inappropriate for a rural village and will:

  • Create noise, vibration, and air emissions harmful to residents
  • Cause light pollution and solar glare, impacting homes and road safety.
  • Increase traffic and congestion, especially on the R680 and R681.
  • Damage Kilmeaden’s rural character, biodiversity, and landscape.
  • Lock us into fossil fuels with 16 gas turbines for decades.

Kilmeaden needs development at a village scale, not to be redefined as an industrial energy and data hub.

We call on Waterford City & County Council to:

  • Refuse permission for planning application 2560625 in its entirety.
  • Protect Kilmeaden’s community, environment, and heritage.

How you can make the difference:

✍️ Please sign and share this petition to make your voice heard. Together, we can protect Kilmeaden for future generations.

⚠️ Most importantly, please also lodge your personal objection with Waterford City & County Council before the deadline of 12th October.

You can do this by:

  • 📧 Emailing your objection (with your name, address, phone number, and the planning reference 2560625) to:planning@waterfordcouncil.ie
    (The planning office will phone you for the €20 statutory fee.)
  • 🌐 Online: via the ePlanning Portal,
  • ✉️ By Post: to the Planning Department, Menapia Building, The Mall, Waterford
  • 🏢 In Person: at the Planning Office (Menapia Building, The Mall, Waterford)

📄To make it easy, we’ve created an Objection Pack with:

  • Step-by-step guide
  • Short objection letter template
  • Comprehensive objection letter template

👉 Download the full pack here:  Kilmeaden Objection Pack (Google Drive)

Supporter Voices

Petition Updates