

Safety concerns with Lloyd Drive exit from Highway 16


Safety concerns with Lloyd Drive exit from Highway 16
The Issue
Residents and visitors accessing properties on the South side of Cluculz lake are at heightened risk due to the the existing Lloyd drive intersection.
The existing entry/exit point was recommended for upgrades to begin in spring of 2019. This project has been delayed and currently resides on Ministry of Transport and Infrastructure (MOTI) 10 year plan. The photo above is the proposed redesign changes recommended by MOTI.
The entry/exit point has resulted in numerous "close calls" due to its unconventional design. The current intersection creates slowdowns and stoppages on highway #16 that cause confusion and increase the likelihood of serious automobile accidents.
This petition is meant to move that MOTI project to a higher priority and get a guaranteed delivery date.
The entry/exit point is the ONLY road that services approximately 170 properties on the South side of the lake.

751
The Issue
Residents and visitors accessing properties on the South side of Cluculz lake are at heightened risk due to the the existing Lloyd drive intersection.
The existing entry/exit point was recommended for upgrades to begin in spring of 2019. This project has been delayed and currently resides on Ministry of Transport and Infrastructure (MOTI) 10 year plan. The photo above is the proposed redesign changes recommended by MOTI.
The entry/exit point has resulted in numerous "close calls" due to its unconventional design. The current intersection creates slowdowns and stoppages on highway #16 that cause confusion and increase the likelihood of serious automobile accidents.
This petition is meant to move that MOTI project to a higher priority and get a guaranteed delivery date.
The entry/exit point is the ONLY road that services approximately 170 properties on the South side of the lake.

751
The Decision Makers
Petition Updates
Share this petition
Petition created on October 7, 2021