

Say NO to 20 metre 5G mast outside Busby station
The Issue
Update (Tue 26/11/24): the owner of the land leased to Double A / John Deere has been in touch to say that he actually also supports this petition: “I object very strongly to being forced to let WHP/O2 erect it against my wishes. It is effectively compulsory purchase!”.
O2 plan to seek approval from East Renfrewshire Council to erect a 20 metre high 5G telecoms mast and radio base station on land to the front or the John Deere depot immediately outside Busby train station.
We have a limited period to register views and objections with the agents acting on behalf of O2 (Cornerstone / WHP Telecoms Ltd).
We have serious concerns and objections in relation to this proposal.
- This huge industrial structure will be several times higher than the surrounding buildings and trees. It is extremely close to neighbouring families’ homes. It will tower over these residents’ homes and dominate their gardens. This will have a hugely negative impact on the ability of these residents and their young children to enjoy their homes and outside space.
- The utilitarian nature of the proposed mast and base station would also have a severe adverse effect on the traditional character of the area more broadly. Busby Conservation Area is comprised of historical Victorian buildings and mature treescapes. Without exception, every other building around or visible from the proposed site is an original period construction: all neighbouring properties (East Kilbride Rd, Station Rd, Carmunnock Rd, The Crescent), the former church / converted flats opposite, The White Cart pub, the train station; even the John Deere building itself. A modern / industrial base station - particularly of such monstrous scale - on the most prominent and open corner location right in the heart of this area would be in stark contrast, and would significantly detract from the appearance and character of the Busby village streetscape.
- We have further concerns as regards the potential health and safety impact of such an installation particularly given that most of the neighbouring properties are occupied by families with young children.
- We believe the installation of such a dominant structure on this busy 4-way junction also represents a potential road safety risk. There is potential distraction for: (a) drivers (in both directions) on East Kilbride Road who are about to navigate a busy bend and “blind” tunnel under the railway bridge, where there are narrow lanes, oncoming traffic moving at speed, and a single narrow pavement often used by parents with young children / prams given there is no alternative route; (b) drivers from Carmunnock Road joining the busy East Kilbride Road, often negotiating to cross lanes between busy two lane traffic, with limited visibility; and (c) drivers emerging on to the busy main road from Station Road, whose visibility may be impaired by the new structure. We feel the large imposing structure could be a dangerous distraction to drivers and pedestrians (from the station or the tunnel).
- We do not understand why this specific location, on the most prominent crossroads at the very heart of Busby village, should be selected for the mast. The village is small in area without a huge density of population, and is surrounded by fields and / or industrial land in all directions. As such, there are a number of alternative sites which we believe should be considered and could be more suitable.
Should this proposal proceed, we will challenge it in the most vigorous of terms.
If an application is made to the planning department at East Renfrewshire Council we will lodge objections with them.
We note a number of recent decisions by various local authorities (including, on more than one occasion, East Renfrewshire Council) to refuse similar applications under permitted development rights on grounds similar to those set out above.
We do recognise the importance of the 5G network, but would urge O2 / Cornerstone / WHP to please consider alternative sites which will better balance these needs with the impact on the community and the visual amenity of our village.
Please note: as well as signing this online petition, please also email objections / comments to Caitlyn Richmond at WHP Telecoms (c.richmond@whptelecoms.com).
550
The Issue
Update (Tue 26/11/24): the owner of the land leased to Double A / John Deere has been in touch to say that he actually also supports this petition: “I object very strongly to being forced to let WHP/O2 erect it against my wishes. It is effectively compulsory purchase!”.
O2 plan to seek approval from East Renfrewshire Council to erect a 20 metre high 5G telecoms mast and radio base station on land to the front or the John Deere depot immediately outside Busby train station.
We have a limited period to register views and objections with the agents acting on behalf of O2 (Cornerstone / WHP Telecoms Ltd).
We have serious concerns and objections in relation to this proposal.
- This huge industrial structure will be several times higher than the surrounding buildings and trees. It is extremely close to neighbouring families’ homes. It will tower over these residents’ homes and dominate their gardens. This will have a hugely negative impact on the ability of these residents and their young children to enjoy their homes and outside space.
- The utilitarian nature of the proposed mast and base station would also have a severe adverse effect on the traditional character of the area more broadly. Busby Conservation Area is comprised of historical Victorian buildings and mature treescapes. Without exception, every other building around or visible from the proposed site is an original period construction: all neighbouring properties (East Kilbride Rd, Station Rd, Carmunnock Rd, The Crescent), the former church / converted flats opposite, The White Cart pub, the train station; even the John Deere building itself. A modern / industrial base station - particularly of such monstrous scale - on the most prominent and open corner location right in the heart of this area would be in stark contrast, and would significantly detract from the appearance and character of the Busby village streetscape.
- We have further concerns as regards the potential health and safety impact of such an installation particularly given that most of the neighbouring properties are occupied by families with young children.
- We believe the installation of such a dominant structure on this busy 4-way junction also represents a potential road safety risk. There is potential distraction for: (a) drivers (in both directions) on East Kilbride Road who are about to navigate a busy bend and “blind” tunnel under the railway bridge, where there are narrow lanes, oncoming traffic moving at speed, and a single narrow pavement often used by parents with young children / prams given there is no alternative route; (b) drivers from Carmunnock Road joining the busy East Kilbride Road, often negotiating to cross lanes between busy two lane traffic, with limited visibility; and (c) drivers emerging on to the busy main road from Station Road, whose visibility may be impaired by the new structure. We feel the large imposing structure could be a dangerous distraction to drivers and pedestrians (from the station or the tunnel).
- We do not understand why this specific location, on the most prominent crossroads at the very heart of Busby village, should be selected for the mast. The village is small in area without a huge density of population, and is surrounded by fields and / or industrial land in all directions. As such, there are a number of alternative sites which we believe should be considered and could be more suitable.
Should this proposal proceed, we will challenge it in the most vigorous of terms.
If an application is made to the planning department at East Renfrewshire Council we will lodge objections with them.
We note a number of recent decisions by various local authorities (including, on more than one occasion, East Renfrewshire Council) to refuse similar applications under permitted development rights on grounds similar to those set out above.
We do recognise the importance of the 5G network, but would urge O2 / Cornerstone / WHP to please consider alternative sites which will better balance these needs with the impact on the community and the visual amenity of our village.
Please note: as well as signing this online petition, please also email objections / comments to Caitlyn Richmond at WHP Telecoms (c.richmond@whptelecoms.com).
Supporter Voices
Petition Updates
Share this petition
Petition created on 19 November 2024