Protect Gibraltar Rock State Natural Viewing Area from 765 kV Line
The Issue
UPDATE: Please consider making our opposition known in these ways as well:
- Contact MGS, the private company responsible, and let them know how we feel about the decision to run this line directly in front of Gibraltar instead of sticking to established routes:
- Email: Connect@MGSWisconsin.com
- OR Call: 608-895-0798
- Show up at one of the “feedback” meetings from Aug. 24-27 to let MGS know the impact of this proposed route.
- Richland County: Monday 8/24, 10A-1P: Richland Center High School: 1996 US-14 W, Richland Center WI 53581
- Sauk County: Tuesday 8/25, 10A-1P: UW-Platteville Baraboo (Lange Center): 1006 Connie Rd, Baraboo WI 53913
- Columbia County: Tuesday 8/25, 4-7P: Whispering Pines: 101 Bethel Dr, Poynette WI 53955
- Dane County: Wednesday 8/26 4-7P: The Round Table: 1611 N Bristol St., Sun Prairie WI 53590
Original Post:
Companies MISO & MGS currently have planned a 190-mile project to install a new powerline system aimed at supplying other regions in the Midwest. This project’s goal is to pass power through our region, not to supply our community. What could this gigantic powerline possibly be designed to supply? They haven’t answered clearly, but I’ve got one guess. One of the proposed routes runs through Lodi, Sauk and directly in front of Gibraltar Rock.
These are not small, but rather 150-200 ft tall towers. The majority of this proposed route cuts directly through private property, fields, farms, and the view from Gibraltar Rock State Natural Viewing Area.
Wisconsin’s power usage has been flat, declining 2.9% over the last 20 years. MISO’s own independent estimate found that the return to this area will only be 40 cents for every dollar spent. Finally, the cost of this project will be passed onto WI and Midwest ratepayers, so we will foot the bill.
We feel that MGS and MISO did not adequately follow Wisconsin Act 89, which requires utility companies to place new powerlines along existing utility corridors or highways/railroads. Please consider signing the petition below to tell these companies they need to re-work their route to follow or upgrade established lines and not destroy our natural landscape.
Ozaukee County petitioners successfully halted a similar ATC proposal in their area this year, so this is possible, but we need as much support as possible!
MGS is hosting an “open house” for “community feedback” on August 25th from 4-7PM at Whispering Pines. Although we were only notified on Thursday 8/6, public comment closes 9/7. We are hoping to have as much community feedback to let them know the impact and to get our local town, county, and state officials to stop this project.
A large part of my father’s legacy was preserving this land. He spent a large portion of his life maintaining and advocating for the preservation of farmland around Gibraltar Rock and in the Driftless region. Please consider sharing, signing our petition, writing/emailing your local officials, anything to help us protect this land!
All facts/information taken from No765kVLine: https://no765line.org/the-765-line/

1,513
The Issue
UPDATE: Please consider making our opposition known in these ways as well:
- Contact MGS, the private company responsible, and let them know how we feel about the decision to run this line directly in front of Gibraltar instead of sticking to established routes:
- Email: Connect@MGSWisconsin.com
- OR Call: 608-895-0798
- Show up at one of the “feedback” meetings from Aug. 24-27 to let MGS know the impact of this proposed route.
- Richland County: Monday 8/24, 10A-1P: Richland Center High School: 1996 US-14 W, Richland Center WI 53581
- Sauk County: Tuesday 8/25, 10A-1P: UW-Platteville Baraboo (Lange Center): 1006 Connie Rd, Baraboo WI 53913
- Columbia County: Tuesday 8/25, 4-7P: Whispering Pines: 101 Bethel Dr, Poynette WI 53955
- Dane County: Wednesday 8/26 4-7P: The Round Table: 1611 N Bristol St., Sun Prairie WI 53590
Original Post:
Companies MISO & MGS currently have planned a 190-mile project to install a new powerline system aimed at supplying other regions in the Midwest. This project’s goal is to pass power through our region, not to supply our community. What could this gigantic powerline possibly be designed to supply? They haven’t answered clearly, but I’ve got one guess. One of the proposed routes runs through Lodi, Sauk and directly in front of Gibraltar Rock.
These are not small, but rather 150-200 ft tall towers. The majority of this proposed route cuts directly through private property, fields, farms, and the view from Gibraltar Rock State Natural Viewing Area.
Wisconsin’s power usage has been flat, declining 2.9% over the last 20 years. MISO’s own independent estimate found that the return to this area will only be 40 cents for every dollar spent. Finally, the cost of this project will be passed onto WI and Midwest ratepayers, so we will foot the bill.
We feel that MGS and MISO did not adequately follow Wisconsin Act 89, which requires utility companies to place new powerlines along existing utility corridors or highways/railroads. Please consider signing the petition below to tell these companies they need to re-work their route to follow or upgrade established lines and not destroy our natural landscape.
Ozaukee County petitioners successfully halted a similar ATC proposal in their area this year, so this is possible, but we need as much support as possible!
MGS is hosting an “open house” for “community feedback” on August 25th from 4-7PM at Whispering Pines. Although we were only notified on Thursday 8/6, public comment closes 9/7. We are hoping to have as much community feedback to let them know the impact and to get our local town, county, and state officials to stop this project.
A large part of my father’s legacy was preserving this land. He spent a large portion of his life maintaining and advocating for the preservation of farmland around Gibraltar Rock and in the Driftless region. Please consider sharing, signing our petition, writing/emailing your local officials, anything to help us protect this land!
All facts/information taken from No765kVLine: https://no765line.org/the-765-line/