

JTA has now released to me some files related to the Mandarin Road , Red Cypress to Walter Jones project. First , the city applied for this grant in 2023 .
proposed sidewalk to be 5 feet wide, with such a width the road will be cookie cutter, and the survey is only 30 per cent complete but even at 30 per cent, many many trees will be slotted for removal as well as vegetation.
Look at picture. Where is there room along the proposed stretch to fit a 5 foot sidewalk without clear cutting the cherished canopies.
Please sign petition and come to meeting and demand for the City, JTA, arborist to tell the truth . They need to tell us many in total trees do they plan to clear cut and completely and forever change the look of this road. The road that brought us here in the first place to invest.