Ref: NHAI/DGM(T)EtPD/PlU C8E/RTI Act/150 1 2/30/2020 -
To
Shri. P.G. Sethuram
14/41, Perandai Kattu Valasu, Vetappa Naicken Vatasu Post, Vellakoil,
Tiruppur D.T.
Sir,
RTIc2005 t
18th January, 2021
Sub: NHAI, PIU - Coimbatore - On-line RTI Application of Shri. P.G. Sethuram, Tiruppur Reply furnished - Reg.
Ref: On-line RTI Application of Shri. P.€. Sethuram, Tiruppur dt.17.12.2020 vide RTI Registration No.NHAlN/R/E/20/04314 dt.17.12.2020 r-eceived in this office on-tine RTI portal dt.21.12.2020.
With reference to on-line RTI Application of Shri. P.G. Sethuram, Tiruppur the following information is furnished.
4. Total estimated cost of Land Acquisition as per Land Acquisition Plan as scrutinized by the RO, NHAI, Chennai.
5. Fund sanctioned and released for the above project during 2019 as per RO, NHAI, Chennai records.
6. Fund balance after expenditure as per NHAI, Chennai records with breakup of Expenditure.
6. KARUR - COIMBATORE GREENWAY extension of NH-67 is 6 lane project or 8 lane project or 12 lane project detai\ requested.
7. KARUR COIMBATORE GREENWAY extension of NH-67 audited balance sheet copy for the financial year 2019-20 from the file of RO, NHAI, Chennai.
The LAC proposal is under preparation by the DPR Consultant. The estimated cost of land acquisition witt be J‹nown after rec+ipt of revised LAC proposal by the consultant.
The NHAI, HQrs sanctioned the amount for the entire project of Karur- Coimbatore Greenfield Alignment including Coimbatore ring road is Rs.8.65 Cr. (as per present condition). The amount released for the above project during FY 2019-20 is Rs.43,30,000/-.
Expenditure breakup as on date for the NH 67 OPR project as per the available record of this office:-
i) DPR Consultant = Rs.2.35 Crore ii)SDRO, Coimbatore = Rs.0.85 €rore
iii) SDRO, Tiruppur = fts.1.91 €rore
iv) SDRO, Karur = Rs.1.55 Crore
v) Total expenditure = Rs.6.66 Crore
vi) Fund balance - Rs.1.99Crore
Four Lane project
Not available in this ofYice.