Repave Beach Drive


Repave Beach Drive
The Issue
We, the citizens of the City of Seattle - Alki neighborhood, petition the City to repave Beach Dr. SW from the intersection of Beach Dr. SW and 61st Ave. SW south to the intersection of Beach Dr. SW and SW Genesee St.
This section of roadway has received numerous "pot hole repairs" but the condition of this stretch of Beach Dr. SW has deteriorated to the point that spot repairs are no longer sufficient. This roadway is frequently used by bicycle riders and the condition of the road poses many hazards to the them and liability to the City of Seattle.
In August of 2015 the City repaved a two block section of Beach Dr. SW just north of the intersection of Beach Dr. SW and 61st Ave. SW. We were pleased by this improvement to the roadway, however we were disappointed that the roadway south of these improvements remained untouched. The condition of the section of road needing repaving is as bad, if not worse in some sections, as the section repaved in August 2015.
With respect, we demand that the City of Seattle repave Beach Dr. SW from 61st Ave. SW south to SW Genesee St.
The Issue
We, the citizens of the City of Seattle - Alki neighborhood, petition the City to repave Beach Dr. SW from the intersection of Beach Dr. SW and 61st Ave. SW south to the intersection of Beach Dr. SW and SW Genesee St.
This section of roadway has received numerous "pot hole repairs" but the condition of this stretch of Beach Dr. SW has deteriorated to the point that spot repairs are no longer sufficient. This roadway is frequently used by bicycle riders and the condition of the road poses many hazards to the them and liability to the City of Seattle.
In August of 2015 the City repaved a two block section of Beach Dr. SW just north of the intersection of Beach Dr. SW and 61st Ave. SW. We were pleased by this improvement to the roadway, however we were disappointed that the roadway south of these improvements remained untouched. The condition of the section of road needing repaving is as bad, if not worse in some sections, as the section repaved in August 2015.
With respect, we demand that the City of Seattle repave Beach Dr. SW from 61st Ave. SW south to SW Genesee St.
Petition Closed
Share this petition
The Decision Makers
Petition Updates
Share this petition
Petition created on January 21, 2016