Reinstate the 100 KMH speed limit on the N11

The Issue

As expected, since the opening of the new M11 gorey to wexford PPP scheme the speed limit on the existing N11 has been downgraded from 100 KM/H to 80 KM/H. 

For residents living in Oilgate, Enniscorthy, Ferns, Camolin and surrounding areas this causes issues due to longer travel times between these areas as the new PPP scheme is not nearly as direct a route as the existing N11. Should one use the new PPP scheme between these areas on short trips, the travel time is the same as the N11 @ 100 KM/H but with increased fuel consumption and pollution. 

The existing N11 has adequate infastructure to continue to safely support a 100 KM/H speed limit between Clough roundabout  and Enniscorthy and also Enniscorthy to Oilgate.

avatar of the starter
Joseph PPetition Starter
Victory
This petition made change with 2,694 supporters!

The Issue

As expected, since the opening of the new M11 gorey to wexford PPP scheme the speed limit on the existing N11 has been downgraded from 100 KM/H to 80 KM/H. 

For residents living in Oilgate, Enniscorthy, Ferns, Camolin and surrounding areas this causes issues due to longer travel times between these areas as the new PPP scheme is not nearly as direct a route as the existing N11. Should one use the new PPP scheme between these areas on short trips, the travel time is the same as the N11 @ 100 KM/H but with increased fuel consumption and pollution. 

The existing N11 has adequate infastructure to continue to safely support a 100 KM/H speed limit between Clough roundabout  and Enniscorthy and also Enniscorthy to Oilgate.

avatar of the starter
Joseph PPetition Starter

Petition Updates

Share this petition

Petition created on 21 July 2019