

Need new railway line between bangalore - chittoor via kolar , Palamaner


Need new railway line between bangalore - chittoor via kolar , Palamaner
The Issue
The existing railway line between Bangalore - chittoor via katpadi is a very long route. It is a circuitous route covering Bangalore - bangarpet - jollarpet - katpadi - chittoor and the total distance is 270kms. This can be reduced to 170 -180kms by laying a new line between bangalore - chittoor via kolar , mulbhagal , palamaner. This new route helps a lot to long run trains going towards Tirupathi , vijayawada, Amaravathi, Bhubhaneshwar and Howrah.
The distance reduced will be about 80-90 kms. A new line 120 km long is to be formed for direct link from Bangalore to Chittoor or Bangarpet to Chittoor .By this new route is possible to reduce the journey time by one hour 30 minutes which attract a lot pilgrims going to tirupathi to use the railway mode instead of the tedious and risky road journey.
Advantages of this new Bangalore - Chittoor Railway line.
1.Safer and comfortable journey for passengers.
2. Relief from traffic congestion on Old Madras Road which will help commuters of Bengaluru. Reduction in consumption of petrol and diesel.
3. Reduces the dependency on the road which in turns reduction in vehicular pollution. Savings in expenses.
4. Provides better connectivity between Bangalore - Tirupathi and possibility of development of other urban areas in the route namely Kolar, Mulbagal, palamaner and chittoor .
5. As kolar being developed as new industrial zone for automobile industry, it helps a lot people who dialy commute to bangalore.

The Issue
The existing railway line between Bangalore - chittoor via katpadi is a very long route. It is a circuitous route covering Bangalore - bangarpet - jollarpet - katpadi - chittoor and the total distance is 270kms. This can be reduced to 170 -180kms by laying a new line between bangalore - chittoor via kolar , mulbhagal , palamaner. This new route helps a lot to long run trains going towards Tirupathi , vijayawada, Amaravathi, Bhubhaneshwar and Howrah.
The distance reduced will be about 80-90 kms. A new line 120 km long is to be formed for direct link from Bangalore to Chittoor or Bangarpet to Chittoor .By this new route is possible to reduce the journey time by one hour 30 minutes which attract a lot pilgrims going to tirupathi to use the railway mode instead of the tedious and risky road journey.
Advantages of this new Bangalore - Chittoor Railway line.
1.Safer and comfortable journey for passengers.
2. Relief from traffic congestion on Old Madras Road which will help commuters of Bengaluru. Reduction in consumption of petrol and diesel.
3. Reduces the dependency on the road which in turns reduction in vehicular pollution. Savings in expenses.
4. Provides better connectivity between Bangalore - Tirupathi and possibility of development of other urban areas in the route namely Kolar, Mulbagal, palamaner and chittoor .
5. As kolar being developed as new industrial zone for automobile industry, it helps a lot people who dialy commute to bangalore.

Petition Closed
Share this petition
Petition Updates
Share this petition
Petition created on 15 September 2016
