Support Additional Conditions for Solar Development

122

Let’s get to 200 signatures!
Petitions with 1,000+ supporters are 5x more likely to win!

The Issue

In Concord, GA, the zoning and planning board has already recognized the need for a thoughtful approach to utility scale solar development. They have rightfully highlighted the importance of placing a moratorium on solar projects until appropriate conditions are met to ensure the community's welfare. However, the board of commissioners now needs to act upon these recommendations and support additional conditions for the proposed solar development.

This initiative aims to safeguard the local ecosystem and ensure that the development is in line with our community values. Solar energy is an essential part of sustainable development, but its execution should not compromise our environment or the well-being of Concord's residents. Additional conditions include strict environmental impact assessments, fire safety precautions, noise control measures, water/aquifer protection, appropriate community engagement, development monitoring requirements, and protections surrounding the decommissioning of the development. Those conditions are listed fully below:

Conditions for Special Exception Modification

Water Protection and Testing

Developer shall retain a qualified third-party environmental firm to conduct water testing for surrounding residential wells within a 1-mile radius.
Baseline testing must be completed prior to any site disturbance.
Contaminants to be monitored include:
Nitrates
Total Dissolved Solids (TDS)
pH
Heavy Metals
Glyphosate
VOCs
Pesticides and Herbicides
PFAS (forever chemicals)
Radiological contaminants (if applicable)
Testing shall occur:
Bi-annually during construction
Annually after construction until full site decommissioning and restoration
Test results must be submitted to the County and made available to impacted residents.
In the event of detected contamination, the developer must provide emergency water supply and remediation services at their own expense.
Herbicides are strictly prohibited. Only organic pesticides are permitted.
Developer must submit a Groundwater Recharge Area Protection Plan, prepared by a qualified hydrogeologist, specific to the site's location in the Flint River Basin recharge area.
 

 

 Noise Control

Project-related noise, including from inverters and substations, shall not exceed 40 decibels (dB) at the property line at any time over the life of the project.
 

Battery Storage and Substation Restrictions

The use of lithium battery ESS (Energy Storage Systems) is prohibited unless a separate Special Exception Modification is approved by both the Planning & Zoning Board and Board of Commissioners (BOC).
Construction of any additional substation shall also require separate review and approval by both boards.
 

Fire and Life Safety

Developer shall submit a Fire Hazard and Risk Assessment prepared by a licensed fire safety engineer.
Panels must be equipped with auto shut-off systems or integrated fire suppression systems.
Class C and Class D fire suppression equipment must be provided on-site.
If fire suppression is not quipped at the panel level, Developer will be required to provide funding for up to two (2) full-time firefighters stationed at the Concord fire station to ensure public safety.
Site must include:
Clearly marked fire lanes
Lockable but emergency-accessible gates
On-site contact information posted at all entry points
Developer must coordinate with local officials to develop and maintain an Emergency Response Plan (ERP) including:
Communication protocols
Evacuation plans
Regular emergency drills at the development site
 Glare Mitigation

A Glare Study must be conducted if the site is near residential properties or aviation paths.
Mitigation strategies shall be implemented based on study results.
 

 Decommissioning Bond and Maintenance

·         A decommissioning bond shall be established and re-evaluated every five (5) years.

·         Developer is responsible for full decommissioning within five (5) years of the termination of the power purchase agreement.

·         If a new contract is pursued with a power company, the developer must undergo a new review and approval process with Planning & Zoning and the BOC to evaluate equipment replacement and any new required conditions.

·         In the absence of a contract, the developer is responsible for maintaining the site until full decommissioning, which must occur within a maximum of five (5) years.

Remediation and Mitigation Plan

·         Developer shall submit a comprehensive Remediation and Mitigation Plan detailing the steps to be taken in the event of noncompliance or failure of any of the above conditions.

 

·         This plan must include corrective actions, timelines, and responsible parties for each condition listed herein.

 

·         The plan is subject to review and approval by the Planning & Zoning Board and shall be updated as needed to remain effective throughout the life of the project.

Oversight and Accountability

Developer shall submit an annual compliance report summarizing:
Water test results
Noise monitoring data
Fire safety inspections
Any complaints and resolutions
The County retains the right to conduct site inspections, with reasonable notice, to verify compliance.
Repeated or unresolved violations of these conditions may result in revocation of the Special Exception and mandatory site decommissioning.
Traffic and Road Use

Developer shall enter into a Road Use and Maintenance Agreement with the County, covering all construction and operations-related traffic.
Any road damage caused by project activity must be repaired at the developer’s expense.
Community Communication

Developer must establish a local point of contact for community concerns and maintain a public-facing phone number and email.
A written complaint resolution process must be approved by the County, with a required 10-day response window for all complaints.
Change in Ownership

Developer must notify the County within 30 days of any transfer of ownership or controlling interest in the project.
All approved conditions remain binding on any successor or assignee.
 