Stop the construction of a data center in Santaquin

1,911

The Issue

I moved to Santaquin to secure a safe environment for my family, away from the dangers of polluted urban settings. Like many residents, I cherish the fresh clean air, the tight-knit community, and the peaceful surroundings that Santaquin provides. However, the recent decision by the city to approve and rezone land for a data center development threatens to compromise this safe haven.

The construction and operation of a data center come with significant environmental risks. As someone deeply concerned about my children’s health, I am alarmed by reports indicating potential cancer-causing pollutants from the release of hazardous emissions associated with such facilities. With parts of the publicly released information being heavily redacted, there is an evident need for transparency and accountability from the authorities.

In 2010, a study from Stanford University revealed that data centers are responsible for about 1.5% of global greenhouse gas emissions—a number that has surely increased in this digital age. Moreover, these facilities tend to consume massive amounts of electricity and water, placing further strain on local resources and potentially contributing to environmental degradation. Is this the future we want for Santaquin?

By supporting this petition, we urge the city council of Santaquin to reconsider their decision and halt the current plans for the data center. We demand a thorough environmental impact assessment, complete with full and unredacted public disclosure, to be carried out. The health of our children and the preservation of our environment must take precedence over industrial and commercial interests.

Let's protect the air we breathe, the water we drink, and the community we love. Your signature can make a difference. Sign this petition to advocate for the health and well-being of all Santaquin residents.

The Decision Makers

Daniel Olson
Santaquin City Mayor
Responded
I would like to share some thoughts and comparisons on the data center. A portion of the Stone Hollow at Summit Ridge Subdivision located at the northeast corner of Summit Ridge, minus the LDS church property, equals approximately 31 acres. I offer this for comparative purposes in this article, as the data center property equals about 32 acres. In that 31-acre subdivision, there are 116 single family homes. Each home pays an average total property tax of $2,750 per home (estimated) per year. Nebo School district gets the majority (72%). Santaquin City gets about $410 from each property in this subdivision per year to go toward City services, recreation, roads, police, fire, EMS, library, and staff, per Utah tax law. Currently, property taxes in all of Santaquin City (residential, commercial, industrial, etc.) would fund City operations for only about seven to eight weeks in a typical year. Annually the data center will use about the same amount of water as 22 single family homes in Santaquin. Within one year, the 31-acre portion of the Stone Hollow subdivision alone would use 5.27 times more water than the data center as estimated. As with all Santaquin City water connections, the data center water usage will be metered and monitored by City staff. The data center is not connected to the power grid and uses no grid power. It will use a series of smaller engines to generate power using natural gas, with emissions contained to its 32-acre site, as required by the EPA and State of Utah Department of Environmental Quality. All emissions are regulated and verified by the federal government via the EPA. Note: the company owns its own natural gas which it will convey through dedicated pipelines to this facility. One fact not often compared but should be noted is very minimal sewer use. The data center sewer is limited to only the employees’ toilets, drinking fountains, break room, etc. This amounts to far less sewer usage than 22 residential homes. The data center’s minimal sewer usage is not an issue and will not significantly impact Santaquin’s Water Reclamation Facility. There are no toxins that can be released from the facility into the City’s sewer system. Nearly all the data center site outside open space will be xeriscape with a few trees and shrubs. For comparative purposes, in the heat of the summer, the whole of Santaquin City uses more than 7 million gallons of water per day for outdoor watering needs. One of the concerns brought up was the possible noise generated from the facility. With the project using the most advanced technology and building practices, this ensures the noise emission from the facility at approximately 65 db (decibels). 65 db is generally the amount of noise generated within a typical working office environment. Noise from the data center will not be an issue. Santaquin will receive its normal portion of the property tax for the facility. The developer will be investing over one billion dollars to build the facility. They maintain many servers and computers and replace roughly one-fifth of them each year. All sales tax for those computer and server replacements will be paid to the State of Utah with the data center using a Santaquin City address, which further benefits the City. The State of Utah has a code that requires a 6% Municipal Energy Tax (MET) be paid to municipalities. This MET tax will provide significant funding to Santaquin City each year going forward. All revenues generated by the facility will provide funding to the City for staffing, recreation, parks, fire, EMS, police, library, and many other services as the council directs. Property taxes, sales taxes, associated Municipal Energy Taxes for purchase of natural gas for the facility can all equate to more than $3 million paid to the City per year once the data center is constructed and operating. For those wondering, all fiber communications for the facility travel through dedicated fiber lines already in place and will not interfere with local business or residential fiber services. Please note that this project was originally not likely to be approved as we were worried about the significant power requirements, the water required, and other concerns. These concerns were all addressed showing minimal impact due to the new technology as is demonstrated by the developer using on-site power with no grid connection and very low water usage. The zoning of the property was approved several years ago with the benefits outweighing our concerns. Some issues continue to be stated by those who use outdated sources of information regarding previous generations of data center construction and operation. See Governor Cox’s Salt Lake Tribune article on low water use and on-site power making these new generation data centers viable for our area if used in the design methods now being implemented. The developer has stated that there will be approximately 100 six-figure jobs associated with this data center that will benefit many because of these high paying jobs. Outside of some construction jobs while the center is being constructed, there will be other support jobs that will be a part of the project for years to come. There have been 11 publicly noticed and video recorded meetings regarding the property and the data center. All are available to the public to view on the City’s website. All of these open public meetings were properly noticed and held per Utah State law. Here are some of the benefits of the data center to the City; Minimal traffic impact after construction. Provides approximately 100 high paying jobs. Low water and sewer use. No grid power connection. EPA standards will be met, protecting our soil and air. The data center will work with the City and wants the residents to benefit from having this industry here on the south end of the Wasatch Front. The data center will be a catalyst to bring in other commercial uses such as restaurants, shopping, and more. The data center will be built in an old gravel pit and will be neighbors to the present gravel pit that will likely be in operation for years to come. After careful evaluation, including presentations from engineers and a review of the most up-to-date technology, this data center will create jobs while placing minimal demand on City resources. It will expand our ability to serve residents and enhance City services without requiring additional taxes or bonding, benefiting families, seniors, and youth throughout the community. This decision was never taken lightly or without discussion with our great City Council and staff. I hope many of you took the time to listen to the developer in the January 6th council meeting and at the open meeting held on January 29th. Thanks, Mayor Dan Olson
Santaquin City Council
5 Members
Brian del Rosario
Santaquin City Council
Travis Keel
Santaquin City Council
Art Adcock
Santaquin City Council

Supporter Voices

Petition Updates