The Issue
The residents of Hampton Bays and surrounding areas are deeply concerned and opposed to the proposed Canal Southampton BESS (Battery Energy Storage System) project on North Road. This would be a huge facility consisting of 30 tractor trailer sized units containing 24 lithium batteries in each trailer. We are petitioning to demand the Town of Southampton put a halt to this project. Consider the following:
- This does not belong in any residential area - the closest home is less than 400 feet away. (Click HERE and go to page 8 of the application for details of the surrounding neighborhoods.)
- This does not belong near any recreational areas such as the Shinnecock Canal and Meschutt Beach - the Canal is less than 800 feet away.
- BESS lithium battery facilities are known to have fire risks.
- BESS lithium battery facilities are known to have air and ground polluting hazards.
- In the event of fire, the location is at a narrow choke point on the East End, where Sunrise, North Road, Montauk Hwy and the LIRR all meet - evacuation would be impossible.
- In the event of fire, runoff will leach into the ground and run into the Shinnecock Canal polluting the canal and bay waters and polluting the air. Wildlife and sea life will be harmed or destroyed.
- There will be noise pollution to the surrounding area.
- Once a BESS is installed in a residential community, the precedent is set; a BESS can be installed in any residential area.
- Finding better energy solutions is imperative, but not if it compromises or threatens the residents and ecosystem of the town of Southampton. Finding the correct location is also imperative!
Please join me in signing this petition so we can protect our community’s safety and preserve our precious environment for generations to come. See the links below for more information.
Important Links:
BESS-Hazards-and-Failure-Modes
BESS California fire-draws-renewed-attention-storage-safety-issues
BESS Southold Moratorium article
Los residentes de Hampton Bays y sus alrededores están profundamente preocupados y se oponen al proyecto propuesto Canal Southampton BESS (Battery Energy Storage System) en North Road. Esta sería una instalación enorme que consta de 30 unidades del tamaño de un remolque de tractor que contienen 24 baterías de litio en cada remolque. Estamos solicitando exigir que la ciudad de Southampton detenga este proyecto. Considere lo siguiente:
- Esto no pertenece a ninguna zona residencial: la casa más cercana está a menos de 400 pies de distancia. (Haga clic AQUÍ y vaya a la página 8 de la solicitud para obtener detalles de los vecindarios circundantes).
- Esto no pertenece a ninguna área recreativa como el Canal Shinnecock y la playa de Meschutt: el Canal está a menos de 800 pies de distancia.
- Se sabe que las instalaciones de baterías de litio BESS tienen riesgos de incendio.
- Se sabe que las instalaciones de baterías de litio BESS tienen peligros contaminantes del aire y del suelo.
- En caso de incendio, la ubicación se encuentra en un estrecho punto de estrangulamiento en el East End, donde Sunrise, North Road, Montauk Hwy y LIRR se encuentran: la evacuación sería imposible.
- En caso de incendio, la escorrentía se filtrará en el suelo y se topará con el Canal Shinnecock contaminando las aguas del canal y la bahía y contaminando el aire. La vida silvestre y marina serán dañadas o destruidas.
- Habrá contaminación acústica en los alrededores.
- Una vez que se instala un BESS en una comunidad residencial, se establece el precedente; un BESS se puede instalar en cualquier área residencial.
- Encontrar mejores soluciones energéticas es imperativo, pero no si compromete o amenaza a los residentes y al ecosistema de la ciudad de Southampton. ¡Encontrar la ubicación correcta también es imperativo!
Por favor, únanse a mí para firmar esta petición para que podamos proteger la seguridad de nuestra comunidad y preservar nuestro precioso medio ambiente para las generaciones venideras.
3,534
The Issue
The residents of Hampton Bays and surrounding areas are deeply concerned and opposed to the proposed Canal Southampton BESS (Battery Energy Storage System) project on North Road. This would be a huge facility consisting of 30 tractor trailer sized units containing 24 lithium batteries in each trailer. We are petitioning to demand the Town of Southampton put a halt to this project. Consider the following:
- This does not belong in any residential area - the closest home is less than 400 feet away. (Click HERE and go to page 8 of the application for details of the surrounding neighborhoods.)
- This does not belong near any recreational areas such as the Shinnecock Canal and Meschutt Beach - the Canal is less than 800 feet away.
- BESS lithium battery facilities are known to have fire risks.
- BESS lithium battery facilities are known to have air and ground polluting hazards.
- In the event of fire, the location is at a narrow choke point on the East End, where Sunrise, North Road, Montauk Hwy and the LIRR all meet - evacuation would be impossible.
- In the event of fire, runoff will leach into the ground and run into the Shinnecock Canal polluting the canal and bay waters and polluting the air. Wildlife and sea life will be harmed or destroyed.
- There will be noise pollution to the surrounding area.
- Once a BESS is installed in a residential community, the precedent is set; a BESS can be installed in any residential area.
- Finding better energy solutions is imperative, but not if it compromises or threatens the residents and ecosystem of the town of Southampton. Finding the correct location is also imperative!
Please join me in signing this petition so we can protect our community’s safety and preserve our precious environment for generations to come. See the links below for more information.
Important Links:
BESS-Hazards-and-Failure-Modes
BESS California fire-draws-renewed-attention-storage-safety-issues
BESS Southold Moratorium article
Los residentes de Hampton Bays y sus alrededores están profundamente preocupados y se oponen al proyecto propuesto Canal Southampton BESS (Battery Energy Storage System) en North Road. Esta sería una instalación enorme que consta de 30 unidades del tamaño de un remolque de tractor que contienen 24 baterías de litio en cada remolque. Estamos solicitando exigir que la ciudad de Southampton detenga este proyecto. Considere lo siguiente:
- Esto no pertenece a ninguna zona residencial: la casa más cercana está a menos de 400 pies de distancia. (Haga clic AQUÍ y vaya a la página 8 de la solicitud para obtener detalles de los vecindarios circundantes).
- Esto no pertenece a ninguna área recreativa como el Canal Shinnecock y la playa de Meschutt: el Canal está a menos de 800 pies de distancia.
- Se sabe que las instalaciones de baterías de litio BESS tienen riesgos de incendio.
- Se sabe que las instalaciones de baterías de litio BESS tienen peligros contaminantes del aire y del suelo.
- En caso de incendio, la ubicación se encuentra en un estrecho punto de estrangulamiento en el East End, donde Sunrise, North Road, Montauk Hwy y LIRR se encuentran: la evacuación sería imposible.
- En caso de incendio, la escorrentía se filtrará en el suelo y se topará con el Canal Shinnecock contaminando las aguas del canal y la bahía y contaminando el aire. La vida silvestre y marina serán dañadas o destruidas.
- Habrá contaminación acústica en los alrededores.
- Una vez que se instala un BESS en una comunidad residencial, se establece el precedente; un BESS se puede instalar en cualquier área residencial.
- Encontrar mejores soluciones energéticas es imperativo, pero no si compromete o amenaza a los residentes y al ecosistema de la ciudad de Southampton. ¡Encontrar la ubicación correcta también es imperativo!
Por favor, únanse a mí para firmar esta petición para que podamos proteger la seguridad de nuestra comunidad y preservar nuestro precioso medio ambiente para las generaciones venideras.
Supporter Voices
Petition Updates
Share this petition
Petition created on June 16, 2023