Restore Local Control Over the Ridgeline Data Center in West Virginia
The Issue
Tucker County, West Virginia, has some of the darkest night skies left in the eastern United States, plus the small mountain towns of Davis and Thomas. Now a company called Fundamental Data plans to build a huge gas-fired power plant and data center campus there, and the people who live nearby have almost no say in it.
The project, called Ridgeline, would start on 291 acres of an old coal-mining site, and local news reports say it could one day grow to 10,000 acres, about 15 square miles. In 2025, weeks after the plan first showed up in a small newspaper notice, state lawmakers passed a law that lets large data centers skip county and town rules on zoning, noise, lighting and views. Gov. Patrick Morrisey signed it.
That leaves residents with no local way to limit how bright, loud or large the site becomes. An analysis by the Northern Virginia Astronomy Club found the first phase alone could raise sky glow near Blackwater Falls State Park by 528%, making its rural night sky look closer to a suburb’s. The local group Tucker United also warns that plans to store up to 30 million gallons of diesel beside a creek could put drinking water downstream at risk. The company says the storage would be safe.
This region spent a century healing from clear-cut logging and coal pollution. Today, skiing, hiking, stargazing and live music draw visitors from across the country. Jobs matter in West Virginia, and Tucker County residents deserve the power to weigh those jobs against these risks themselves.
Gov. Morrisey and the West Virginia Legislature should restore local authority over zoning, lighting and noise for large data centers, and require a full public health and water safety review before Ridgeline moves forward.
Sign the petition to give Tucker County a real say before Ridgeline breaks ground.

174
The Issue
Tucker County, West Virginia, has some of the darkest night skies left in the eastern United States, plus the small mountain towns of Davis and Thomas. Now a company called Fundamental Data plans to build a huge gas-fired power plant and data center campus there, and the people who live nearby have almost no say in it.
The project, called Ridgeline, would start on 291 acres of an old coal-mining site, and local news reports say it could one day grow to 10,000 acres, about 15 square miles. In 2025, weeks after the plan first showed up in a small newspaper notice, state lawmakers passed a law that lets large data centers skip county and town rules on zoning, noise, lighting and views. Gov. Patrick Morrisey signed it.
That leaves residents with no local way to limit how bright, loud or large the site becomes. An analysis by the Northern Virginia Astronomy Club found the first phase alone could raise sky glow near Blackwater Falls State Park by 528%, making its rural night sky look closer to a suburb’s. The local group Tucker United also warns that plans to store up to 30 million gallons of diesel beside a creek could put drinking water downstream at risk. The company says the storage would be safe.
This region spent a century healing from clear-cut logging and coal pollution. Today, skiing, hiking, stargazing and live music draw visitors from across the country. Jobs matter in West Virginia, and Tucker County residents deserve the power to weigh those jobs against these risks themselves.
Gov. Morrisey and the West Virginia Legislature should restore local authority over zoning, lighting and noise for large data centers, and require a full public health and water safety review before Ridgeline moves forward.
Sign the petition to give Tucker County a real say before Ridgeline breaks ground.