SECTION 1. PURPOSE AND FINDINGS

A. Purpose.

The purpose of this Ordinance is to establish reasonable, evidence-based regulations for the siting, construction, operation, expansion, and decommissioning of Data Centers within Navajo County. This Ordinance is intended to ensure that Data Centers are developed in a manner that protects neighboring property owners, agricultural operations, water resources, air quality, public health, fire safety, and the rural character of the County while allowing for responsible economic development.

B. Findings.

The Board of Supervisors finds that:

Large-scale Data Centers consume significant amounts of electricity and water and can place substantial demands on local infrastructure and natural resources.

Data Centers can generate noise, heat, visual impacts, traffic, and air quality concerns that affect surrounding properties and communities.

Data Centers often include large Battery Energy Storage Systems (BESS) that present unique and difficult-to-manage fire and hazardous materials risks.

Unregulated or poorly sited Data Centers can impose external costs on residents, including impacts on property values, utility rates, road maintenance, insurance availability, and quality of life.

Proper siting standards, mandatory environmental protections, infrastructure requirements, fire safety standards, and robust decommissioning safeguards are necessary to protect public health, safety, and welfare.

This Ordinance is adopted pursuant to the County’s authority under A.R.S. Title 11, Chapter 6, and is intended to be consistent with the Navajo County Comprehensive Plan.

SECTION 2. DEFINITIONS

For purposes of this Ordinance, the following terms shall have the meanings ascribed below:

“Data Center” means any facility used primarily for the storage, processing, or distribution of digital data, including server farms, colocation facilities, hyperscale data centers, and associated infrastructure (such as cooling systems and backup generators) with a total nameplate power demand of 5 MW or greater.

“Battery Energy Storage System (BESS)” means any system that stores electrical energy using lithium-ion or similar battery technology for later distribution, whether standalone or associated with a Data Center.

“Non-Participating Property” means any parcel of land that is not under lease, easement, or other agreement with the owner or operator of a Data Center for the purpose of hosting project components.

SECTION 3. APPLICABILITY

This Ordinance applies to all new Data Centers and to expansions or material modifications of existing Data Centers proposed or located within the unincorporated area of Navajo County, to the extent not protected by vested rights under Arizona law.

SECTION 4. SETBACKS AND SITING STANDARDS

A. Minimum Setbacks from Non-Participating Properties

All components of a Data Center, including buildings, cooling systems, generators, substations, parking areas, and Battery Energy Storage Systems, shall be set back a minimum of 1,500 feet from the property line of any non-participating property.

B. Setbacks from Residences

No Data Center building, major equipment, or BESS component shall be located closer than 2,000 feet from any existing residence on a non-participating property.

C. Enhanced Setbacks in Sensitive Areas

The County shall require greater setbacks from schools, hospitals, churches, historic sites, wildlife corridors, riparian areas, high wildfire risk zones, and other sensitive resources as determined during the permitting process.

D. Variance for Participating Landowners

Participating landowners may request a variance from certain setback requirements applicable to their own property, provided that the variance does not reduce setbacks below the minimum required to protect non-participating properties, public health, safety, or welfare.

SECTION 5. WATER, POWER, ENVIRONMENTAL, AND FIRE SAFETY STANDARDS

A. Water Use (Mandatory Protections)

Applications shall include a detailed water use plan showing projected annual consumption, source of water, and conservation measures. The County shall impose limits on water use and require ongoing monitoring and reporting. The County may deny a permit if water resources are inadequate to protect existing residential, agricultural, or municipal users.

B. Power Demand & Grid Impact

Applications shall include an analysis of projected power demand and impact on the local electrical grid. The County shall require the applicant to fund necessary grid upgrades or demonstrate adequate power availability without negatively impacting residential or agricultural users.

C. Battery Energy Storage Systems (BESS) and Fire Safety

1.  All Data Centers proposing or including Battery Energy Storage Systems shall submit a detailed Fire Prevention, Protection, and Emergency Response Plan.

2.  The plan shall address thermal runaway risks, on-site suppression systems, water supply adequacy, coordination with local fire districts, and multi-day monitoring protocols.

3.  The applicant shall post a separate Pre-Incident Fire Suppression Bond in an amount determined by the County based on the size and risk profile of the BESS installation. This bond is separate from the decommissioning bond.

4.  The County may require larger setbacks for BESS components due to fire and hazardous materials risks.

D. Noise

Sound levels from Data Center operations shall not exceed 45 dBA (day) / 40 dBA (night) at the property line of any non-participating residence.

E. Visual Impact and Screening

Data Centers shall be designed and sited to minimize visual impacts on scenic vistas and views from public roads and neighboring properties. The County shall require vegetative screening, berms, or other mitigation measures where necessary.

F. Air Quality and Heat Island Effects

Backup generators and cooling systems shall comply with all applicable air quality regulations. The County may require measures to reduce heat island effects.

G. Baseline Environmental Testing

Prior to construction, the applicant shall conduct baseline soil and groundwater testing at locations approved by the County. Post-decommissioning testing shall be required to confirm no contamination has occurred. Results shall be provided to the County and made available to the public upon request.

H. Cumulative Impacts

When two or more Data Centers are proposed in the same area or watershed, the County shall require a cumulative impact analysis addressing combined effects on water resources, electrical grid capacity, traffic, fire risk, and quality of life.

SECTION 6. ROAD USE AND INFRASTRUCTURE

A. Before construction or major expansion, the owner shall enter into a road-use agreement with Navajo County and any affected public road authority.

B. The owner shall repair, reconstruct, or reimburse all damage to public roads, rights-of-way, and infrastructure caused by construction, operation, maintenance, or decommissioning of the Data Center.

C. The County may require engineering review, traffic studies, and financial assurance for road impacts.

SECTION 7. DECOMMISSIONING AND FINANCIAL ASSURANCE (STRENGTHENED)

A. Before issuance of permits, the owner shall submit a Decommissioning and Site Restoration Plan approved by Navajo County.

B. The plan shall provide for removal of all buildings, equipment, generators, cooling systems, foundations (to a minimum depth of ten feet below grade), and restoration of the site to a condition suitable for future lawful use.

C. The owner shall provide Financial Assurance (performance bond, irrevocable letter of credit, or cash security) in an amount equal to at least one hundred fifty percent (150%) of the independently verified estimated cost of decommissioning and site restoration.

D. Financial Assurance shall be provided by the parent company or an insurer rated A- or better by A.M. Best (or equivalent) if the applicant is a subsidiary, special purpose vehicle, or limited liability company. This requirement is intended to prevent avoidance of liability through corporate structuring.

E. Financial Assurance amounts shall be reviewed by an independent third party at least every three (3) years and adjusted as necessary.

F. Financial Assurance shall remain in effect until the County confirms completion of decommissioning and restoration.

SECTION 8. ENFORCEMENT

Any violation of this Ordinance constitutes a zoning violation. Navajo County may pursue permit denial, permit suspension, permit revocation, stop-work orders, notices of violation, civil penalties, injunctive relief, abatement, use of Financial Assurance, recovery of enforcement costs, and other lawful remedies.

SECTION 9. AMENDMENTS

Amendments to this Ordinance shall be made in accordance with the procedures set forth in A.R.S. Title 11, Chapter 6, and other applicable Arizona law.

SECTION 10. SEVERABILITY

If any provision of this Ordinance is declared invalid, the remaining provisions shall remain in full force and effect.

SECTION 11. EFFECTIVE DATE

This Ordinance shall become effective thirty (30) days after adoption by the Navajo County Board of Supervisors.

avatar of the starter
Kelly MeixlerPetition StarterMy husband and I strive to protect a spring on a piece of paradise in Apache County. My profile pic shows the 130+ year old cottonwoods that were photographed for the Library of Congress in 1904.

The Decision Makers

Katie Hobbs
Arizona Governor
Kimberly Yee
Arizona Treasurer

Supporter Voices

Petition Updates