Seriously evaluate rail tunnel alternative for Werribee Line
The Issue
The Werribee Hoppers Crossing Community is generally excited about the prospect of the improved vehicle traffic flow at the 3 level crossing project sites, but less so about the pedestrian access.
We believe that a tunnel based solution potentially delivers an even better outcome and addresses other needs of the municipality as it continues to grow by factor of 4 to over 1 Million people only 17 years after the infrastructure planned in the LXRA's 3 preferred solutions is completed.
Due to the imminent completion of the Forrestfield railway line in Perth with 8.5km long, dual tunnels passing under Swan River, 3 new railway stations for ~$1.8Bn (see here) we request the government investigate this approach, if necessary taking it out of the LXRA project deliverable scope. The standard gauge freight line can be routed through a third tunnel or rerouted via to the Western Intermodal Freight Terminal at Truganina.
We request a priority assessment be made on this option before LXRA's solution is progressed further.

Petition Closed
The Issue
The Werribee Hoppers Crossing Community is generally excited about the prospect of the improved vehicle traffic flow at the 3 level crossing project sites, but less so about the pedestrian access.
We believe that a tunnel based solution potentially delivers an even better outcome and addresses other needs of the municipality as it continues to grow by factor of 4 to over 1 Million people only 17 years after the infrastructure planned in the LXRA's 3 preferred solutions is completed.
Due to the imminent completion of the Forrestfield railway line in Perth with 8.5km long, dual tunnels passing under Swan River, 3 new railway stations for ~$1.8Bn (see here) we request the government investigate this approach, if necessary taking it out of the LXRA project deliverable scope. The standard gauge freight line can be routed through a third tunnel or rerouted via to the Western Intermodal Freight Terminal at Truganina.
We request a priority assessment be made on this option before LXRA's solution is progressed further.

The Decision Makers
Petition Updates
Share this petition
Petition created on 15 July 2019