

LET'S ACT NOW 4 CLIMATE!
The Issue
Have you ever stepped outside and felt the air burn against your skin? Have you ever woken up to rain pounding so violently, it feels like the sky itself is breaking apart? Have you ever seen children wading through floodwater, their toys and books floating away, their futures slipping from their grasp? This is not just weather. This is our planet crying out. And it is crying louder than ever before.
Let’s be real. Climate change isn’t some far-off problem. It’s here. It’s the reason we sweat buckets under the sun, the reason floods keep surprising us, and the reason our favorite places in the Philippines are at risk. We cannot wait for another storm to remind us of what’s at stake every typhoon that passes is not just a tragedy it’s a warning for us and and every delay is a choice to abandon the next generation and the environment.
Our government chose profit over people, business over action. They covered our eyes, and we became blind. They fed us false promises, and we became fools in our own land.
Here in the Philippines, billions of pesos are promised each year for flood control. But greed swallows them whole. And what are we left with? Families with nothing but soaked clothes on their backs. Students missing school, again and again. Mothers and fathers watching homes they built with their bare hands drown in dirty water.
HOW CAN WE RELATE IT HERE IN PHILIPPINES ESPECIALLY THE BUDGET MISUSED, GHOST PROJECTS, AND CORRUPTION?
1. Bulacan province – Multiple non‐existent projects
In Bulacan (towns like Calumpit, Malolos, Hagonoy), several flood control projects awarded to contractors Wawao Builders, SYMS Construction have been confirmed to be “ghost” or non-existent.
Wawao Builders got ~ ₱5.97 billion worth of flood control contracts in Bulacan from DPWH, out of over ₱9B nationwide. Some of these seem to be non-existent or with no trace on the ground.
SYMS Construction was involved in a contract to build a concrete river wall in Barangay Piel, Baliuag (Bulacan) worth ₱55.7 million. Payments were made, project listed as “100% complete”, but no structure, no materials seen on site.
2. Oriental Mindoro – Missing / substandard flood control projects
DPWH Secretary Vince Dizon found that at least three flood control projects in Oriental Mindoro listed in the 2024 national budget could not be found on the ground. These include road dikes / esplanades along both sides of the Panggalaan River in Naujan, and a road dike along the Mag-asawang Tubig River.
Also, a ₱2.67-billion dike project in Barangay Tagumpay (split into several contracts) was found to be substandard — sheet piles used were much shorter than required. Local authorities noted lack of coordination and permits.
3. Overall scale and cost
The Department of Finance (DOF) estimates that ghost flood control projects cost the Philippine economy between ₱42.3 billion to ₱118.5 billion from 2023-2025.
There have been over 100 reports of ghost or very substandard projects in just two weeks in September 2025.
If those meant to protect us steal from us, how can we fight climate change? WE DESERVE TRANSPARENCY, WE NEED ACCOUNTABILITY!
But here’s the twist: saving the planet doesn’t have to be boring. Small actions are like cheat codes for a better future. Switch off that light when you leave the room, ditch the single-use plastics, bring your own tumbler, or plant even just one tree. These might sound small, but put together, they’re game-changing.
Indeed, there is still hope. There is still a chance. we can still minimize the effects together. Through smarter choices and cleaner energy, we can protect our future.
Please STAND WITH US For the people. For the climate. For OUR environment.
SIGN THIS PETITION!
CTRL-P(ILI)pinas: Act Now 4 Climate

106
The Issue
Have you ever stepped outside and felt the air burn against your skin? Have you ever woken up to rain pounding so violently, it feels like the sky itself is breaking apart? Have you ever seen children wading through floodwater, their toys and books floating away, their futures slipping from their grasp? This is not just weather. This is our planet crying out. And it is crying louder than ever before.
Let’s be real. Climate change isn’t some far-off problem. It’s here. It’s the reason we sweat buckets under the sun, the reason floods keep surprising us, and the reason our favorite places in the Philippines are at risk. We cannot wait for another storm to remind us of what’s at stake every typhoon that passes is not just a tragedy it’s a warning for us and and every delay is a choice to abandon the next generation and the environment.
Our government chose profit over people, business over action. They covered our eyes, and we became blind. They fed us false promises, and we became fools in our own land.
Here in the Philippines, billions of pesos are promised each year for flood control. But greed swallows them whole. And what are we left with? Families with nothing but soaked clothes on their backs. Students missing school, again and again. Mothers and fathers watching homes they built with their bare hands drown in dirty water.
HOW CAN WE RELATE IT HERE IN PHILIPPINES ESPECIALLY THE BUDGET MISUSED, GHOST PROJECTS, AND CORRUPTION?
1. Bulacan province – Multiple non‐existent projects
In Bulacan (towns like Calumpit, Malolos, Hagonoy), several flood control projects awarded to contractors Wawao Builders, SYMS Construction have been confirmed to be “ghost” or non-existent.
Wawao Builders got ~ ₱5.97 billion worth of flood control contracts in Bulacan from DPWH, out of over ₱9B nationwide. Some of these seem to be non-existent or with no trace on the ground.
SYMS Construction was involved in a contract to build a concrete river wall in Barangay Piel, Baliuag (Bulacan) worth ₱55.7 million. Payments were made, project listed as “100% complete”, but no structure, no materials seen on site.
2. Oriental Mindoro – Missing / substandard flood control projects
DPWH Secretary Vince Dizon found that at least three flood control projects in Oriental Mindoro listed in the 2024 national budget could not be found on the ground. These include road dikes / esplanades along both sides of the Panggalaan River in Naujan, and a road dike along the Mag-asawang Tubig River.
Also, a ₱2.67-billion dike project in Barangay Tagumpay (split into several contracts) was found to be substandard — sheet piles used were much shorter than required. Local authorities noted lack of coordination and permits.
3. Overall scale and cost
The Department of Finance (DOF) estimates that ghost flood control projects cost the Philippine economy between ₱42.3 billion to ₱118.5 billion from 2023-2025.
There have been over 100 reports of ghost or very substandard projects in just two weeks in September 2025.
If those meant to protect us steal from us, how can we fight climate change? WE DESERVE TRANSPARENCY, WE NEED ACCOUNTABILITY!
But here’s the twist: saving the planet doesn’t have to be boring. Small actions are like cheat codes for a better future. Switch off that light when you leave the room, ditch the single-use plastics, bring your own tumbler, or plant even just one tree. These might sound small, but put together, they’re game-changing.
Indeed, there is still hope. There is still a chance. we can still minimize the effects together. Through smarter choices and cleaner energy, we can protect our future.
Please STAND WITH US For the people. For the climate. For OUR environment.
SIGN THIS PETITION!
CTRL-P(ILI)pinas: Act Now 4 Climate

Supporter Voices
Petition Updates
Share this petition
Petition created on October 3, 2025