Petition updateForce Colorado Springs to Repair the Barr Trail
FOREST SERVICE OVERSIGHT OF MANITOU INCLINE FLAWED
COS Land Swap
Mar 18, 2018
This is the text of an email I sent to the USFS and our local media today:
Hello,
I am of the opinion that the Manitou Incline
will have to be closed permanently. The City
of Colorado Springs is withholding information
from the public and deceiving them. I am
certain that there are numerous violations of
the Special Use Permit, has the Forest Service
notified the City? Why has no mention of
problems with the Incline been made in the
media?
The Incline is in violation of several of the
promises that were made during the public
comment process which approved its legal
opening.
During the public comment process conducted by
the Manitou Incline Task Force we were
promsied an alternate route down from the
Incline to alleviate the excessive numbers of
Incline hikers coming down the Barr Trail. I
only withdrew my opposition to the legal
opening of the Incline because of this
promise. The Incline has been open for five
years already, and the process to approve such
an alternate route down has not even begun.
Why is that? Does the Forest Service believe
that an alternate route is even feasible? If
it is not, should the public not be informed?
The Incline suffers from chronic mismanagment.
During the public comment process it was
determined that 75,000 people were using the
Barr Trail to come down from the Incline each
year. Had the public been told that they were
going to allow 300,000 or 400,000 people to
use the Barr Trail to come down from the
Incline in a year the public would never have
allowed to Incline to be legally opened. Do
the current excessive numbers of people coming
down the Barr Trail not offend the Special Use
Permit?
Many Incline users run down the Barr Trail.
This enhances what I call the unnecessary pain
and suffering of the Barr Trail hikers and
backpackers. It is my opinion that Incline
users have no need to run down the Barr Trail.
and it both lessens my enjoyment of the trail,
and makes hiking up the Barr Trail more
difficult.
In the Manitou Incline Site Development and
Management Plan, on page v-11 it states that
certain steps are required before the Incline
would be legally opened. #10. Safety repairs
to Incline including: debris and hazardous
rebar removal and tie stabilization. Incline
will be closed during work.
No tie stabilization was done, and yet the
Forest Service issued the Special Use Permit.
Why was this work not completed before the
legal opening of the Incline, and why did the
Forest Service issue the Permit? Were all
parties not required to obtain approval from
the public before omitting any of the promised
steps?
Many people become obsessed with the Incline
to an unnatural degree. Someone or something
seems to be exerting an undue influence on
Incline users. Are laws being broken or are
citizens rights being violated by Incline
management?
My sources tell me that the Task Force was
advised against trying to maintain the Incline
because in the absence of the rails the ties
would not remain stable. Constant maitenience
would be required to prevent the ties from
wiggling or coming completely loose. The
public was never told this, but logic
certainly supports it. I asked the City of
Colorado Springs about this.
Here are two questions that I posed to the
Mayor and City Council. They avoided my
questions and I received a response from Kurt
Schroeder of Parks and Recreation.
"I have heard that as long as the three sets
of rails were on the ties the entire Incline
was one piece, but as soon as the rails were
removed the long term stability of the Incline
was compromised." ANSWER - You are incorrect.
The rails were removed and the incline
operation ceased after storms caused
significant washouts that compromised the
integrity of the track. The rails did not
ensure the stability of the incline. The
incline owners then removed the rails and sold
them for scrap.
"Did the Manitou Incline Task consult with a
professional engineering firm about the long
term stability of the Incline? Did the City do
so before assuming responsibility for the
maintenance of the incline? What do the
consultant's analysis say about these issues?"
ANSWER - The Task Force did not, that was not
their role. The City did however. Significant
engineering was conducted prior to the final
design being completed. The analysis said that
the incline was unstable and recommended
repairs that would make it stable which the
City then instituted.
Mr Schroeder clearly made an incorrect
statement when he says that the Task Force did
not consult with a professional engineering
firm about the long term stability of the
Incline. This “mistake” is a huge red flag.
The Forest Service had two representatives on
the Task Force. Does the Forest Serice have a
copy of the engineering reports obtained by
the Task Force, and if so, what do they say?
If the Task Force made a mistake or
inadvertently omitted important information
during the public comment process, either the
public must now be informed, or the Incline
must now be closed.
Here are two more questions and answers from
the same email:
Are any ties on the Incline loose today? -
No.
Does the Incline meet the safety standards
required by the Special Use Permit today? -
Yes
Does the Forest Service agree with those two
statements? I have been told that some ties on
the middle section of the Incline are already
beginning to move some again. What do Forest
Service inspections reveal?
What environmental analysis were required
before the work on the upper section of the
Incline was performed. That land is owned by
the Forest Service, were stricter standards
required, and if so were they fulfilled?
Thank you, Carl Strow