Petition updateFlooded in kampung Johan Setia KlangThe conclusion to flood in Johan Setia
Sulaiman AlimonKlang, Malaysia
Dec 5, 2022

Through our observation n findings,

  1. LRT3 is the CULPRIT to the drainage system haywire.
  2. LRT3 project has purposely changed the existing drainage system.
  3. LRT3 has not replaced the existing drainage system back in order
  4. LRT3 has failed to comply with the proper drainage system for the safety n security of the people of Johan setia
  5. Example given, from LRT DEPOH to main drain is not properly built.
  6. Example given, from lorong Johan Setia 1 cross to Klang Banting road has only small drain hole pipe
  7. Example given, from lorong Johan Setia 1 to the main drain has no drain system to be replaced at all. 
  8. LRT3 has failed to comply with the authorities requirements unless they have agreed an undertable agreement.
  9. The technical authority engaged by the government has failed to fullfil the important of proper drainage system.
  10. This project is a FAILURE TO THE SAFETY AND SECURITY OF THE PEOPLE OF JOHAN SETIA WITH HAVING PROPER MANAGEMENT RISKS CONSULTATION
  11. JPS Jabatan Peparitan n Saliran also has neglected and failed to advice the project do n don't  process 
  12. The YBs Kota Raja and Sg Kandis have also contribute to this blunders, negligent, overlooked and problematic flood issues in Johan Setia.
  13. Lastly, flood is mainly not because of act of God but act of human mistakes 