Connect SR 442 to SR 415: A Hurricane Evacuation Route for Southeast Volusia
The Issue
Help Us, Volusia and Florida Neighbors: Edgewater Has No Road West Before Deering Park Traffic Hits
On August 24, 1992, Hurricane Andrew came at Florida from the east. It went from Category 1 to Category 5 in 30 hours. It leveled Homestead. Destroyed over 25,000 homes. Damaged over 100,000 more. 44 people died in Florida. 250,000 were left homeless. 1.2 million people evacuated. Nobody saw Category 5 coming until it was too late.
If that storm hits Edgewater, where do you go?
North puts you into New Smyrna Beach traffic on 44. South puts you into Oak Hill and Titusville. Every route out of Edgewater goes north or south first, dumping us into another city's gridlock on roads that are already over capacity. There is no road west. We become someone else's problem on someone else's roads, and we all sit there together going nowhere.
Now add Deering Park. Groundbreaking happened in 2025. The first homes arrive in early 2027. At full buildout, the Farmton entitlement allows up to 23,100 residential units and 4.7 million square feet of commercial space in Volusia County. That traffic lands on 442, US 1, I-95, and SR 44 with zero new roads planned.
To the Volusia County Council and Volusia Flagler TPO: Study a road connecting SR 442 in Edgewater west to SR 415 in Osteen, and put it on the TPO priority list now.
From 415, you reach Howland Boulevard through Deltona to I-4 at Exit 114. Doyle Road to I-4 at Exit 108. SR 46 to I-4 through Sanford. Three routes to I-4. West. Inland. Away from the coast. Away from the storm. Not back onto 44.
This is not about building something new on a whim. The county has known about this for decades. In the mid 1990s they posted a sign near 95 and 442 that said "westward we will go." They never did it. The Farmton Local Plan adopted in 2011 includes a Spine Transportation Network with proposed road corridors through the Farmton property. The framework for this road already exists on paper. It has just never been studied.
What I hear most and the facts behind each one:
"A road brings more building." The land west of 442 is under 46,000 acres of permanent conservation easements. It cannot be developed. There is nothing to open up.
"Flooding." Any road must pass a full environmental study and a St. Johns River Water Management District permit. By law it cannot make flooding worse.
"Orlando beach traffic." They already have 44 and 46 to the beach. A road from 442 to 415 takes them out of their way. This is not a shortcut to anywhere for Orlando.
"They will take people's land." The land is privately owned tree farm, not neighborhoods. Florida law requires full compensation including legal fees.
"Just widen 442." Widening 442 still dumps everyone onto the same few roads at each end. You need a second way out, not a wider funnel into the same bottleneck.
"Just use 44." 44 is already a nightmare. New Smyrna Beach is sprawling in every direction and everything west on 44 is growing with it. Sending more traffic onto a road that is already over capacity is not a plan. It is surrender.
"Maytown Road already goes west." Have you actually driven Maytown? It starts in Oak Hill, over 10 miles south of 442. Nobody in Edgewater is driving 10 miles south to go west. It is a backwoods two lane road that winds in almost every direction on a compass. The drainage is a disaster. There is nowhere for the water to go. The ditches along Maytown are almost always full of water as it is. On a normal day. Now picture that road during a hurricane or tropical storm when it is actually raining. Maytown itself is a flood hazard. The road that people want to call an evacuation route floods before the emergency even starts. There is zero cell phone service on most of that stretch. No gas stations. No services of any kind. If you break down, run out of fuel, get stuck in standing water, or have a medical emergency during an evacuation, you cannot call 911. You cannot call anyone. You are stranded on a flooding, unlit, two lane backroad in the middle of nowhere with no way to get help and no one coming to find you. Anyone who thinks Maytown Road is a realistic evacuation route for Edgewater has either never driven it or has suffered several traumatic brain injuries that prevent them from understanding what they are looking at. That is not an evacuation route. That is where you go to die in the dark with no cell signal while the water rises around your car.
"It will flood 415 with traffic." A study does not just drop a road on 415 and walk away. It evaluates what improvements are needed on every road involved. If 415 needs upgrades, the study identifies that. Ignoring the problem does not make 415 better.
"The study was already done." No it was not. The VFTPO System Reliever Evaluation from April 2025 lists potential corridors for future study. The SR 442 to SR 415 connection is not included. The SR 417 Extension Study from the early 2000s examined a completely different road for a completely different purpose. No study of this connection has ever been done.
"Conservation agreements prohibit roads." No they do not. SR 44 crosses conservation land. SR 46 crosses conservation land. The Farmton Local Plan itself includes proposed road corridors through the conservation area. Conservation easements restrict development. They do not prohibit roads.
"Not yet." The homes arrive in 2027. Roads take years to study, plan, and build. "Not yet" is already late.
"It will never happen." They said the same thing about the sign they posted in the 1990s. The difference is that now there is a petition, community support, and officials are in the conversation. Things happen when people push for them.
"The petition promotes growth." The petition does not create a single home. The development is already approved. Already permitted. Already under construction. The petition asks for a road so the people already here and the people coming are not trapped on the coast when a storm hits.
"Just leave earlier." Tell that to the 44 people who died when Andrew hit. Tell that to every family with kids, elderly parents, or pets who need time to pack and go. "Just leave earlier" is not an evacuation plan for a city. It is advice for one person going to the airport.
Deering Park is coming either way. We can refuse to let it bury us in traffic. Study this road before the traffic shows up, not after.
Sign it: c.org/mMsVkpZJ5Z Then comment "Signed" so your neighbors know they are not alone.
Sources:
Hurricane Andrew. NOAA/NWS. Category 5, landfall near Homestead FL, August 24, 1992. weather.gov/news/220822-hurricane-andrews
Edgewater population: 23,314. U.S. Census Bureau, American Community Survey 5-Year Estimates (2019-2023).
Deering Park permitted for up to 4,692 dwelling units. farmtontreefarm.com/view-news.html?id=24
ITE trip generation rate: 9.44 daily vehicle trips per dwelling unit. Institute of Transportation Engineers, Trip Generation Manual, 11th Edition, Land Use Code 210.
Farmton Local Plan: up to 23,100 residential units and 4.7 million sq ft commercial in Volusia County. farmtontreefarm.com/view-news.html?id=25
Conservation easements: 46,000+ acres permanent as of February 2025. farmtontreefarm.com/environmental-stewardship.html
Farmton total acreage: approximately 70,000 acres in Volusia and Brevard counties. farmtontreefarm.com/faq.html
Farmton Local Plan Spine Transportation Network with proposed road corridors. Volusia County Ordinance 2011-10, Exhibit C. volusia.org/core/fileparse.php/5525/urlt/2-Executed-Ordinance-2011-10.pdf
Farmton Conservation Management Plan. Volusia County Ordinance 2013-07. volusia.org/core/fileparse.php/4407/urlt/Farmton_CMP_w-appendices2.pdf
Infrastructure neutrality: developers pay for required infrastructure. Farmton Local Plan, Ordinance 2009-34 and 2011-10.
Deering Park groundbreaking April 17, 2025. farmtontreefarm.com/view-news.html?id=32
VFTPO System Reliever Evaluation, April 7, 2025. SR 442 to SR 415 connection is not included. r2ctpo.org/wp-content/uploads/VF2050_System-Reliever-Evaluation_2025.04.07.pdf
SR 417 Extension Study. Florida Turnpike Enterprise, early 2000s. Different road, different purpose.

261
The Issue
Help Us, Volusia and Florida Neighbors: Edgewater Has No Road West Before Deering Park Traffic Hits
On August 24, 1992, Hurricane Andrew came at Florida from the east. It went from Category 1 to Category 5 in 30 hours. It leveled Homestead. Destroyed over 25,000 homes. Damaged over 100,000 more. 44 people died in Florida. 250,000 were left homeless. 1.2 million people evacuated. Nobody saw Category 5 coming until it was too late.
If that storm hits Edgewater, where do you go?
North puts you into New Smyrna Beach traffic on 44. South puts you into Oak Hill and Titusville. Every route out of Edgewater goes north or south first, dumping us into another city's gridlock on roads that are already over capacity. There is no road west. We become someone else's problem on someone else's roads, and we all sit there together going nowhere.
Now add Deering Park. Groundbreaking happened in 2025. The first homes arrive in early 2027. At full buildout, the Farmton entitlement allows up to 23,100 residential units and 4.7 million square feet of commercial space in Volusia County. That traffic lands on 442, US 1, I-95, and SR 44 with zero new roads planned.
To the Volusia County Council and Volusia Flagler TPO: Study a road connecting SR 442 in Edgewater west to SR 415 in Osteen, and put it on the TPO priority list now.
From 415, you reach Howland Boulevard through Deltona to I-4 at Exit 114. Doyle Road to I-4 at Exit 108. SR 46 to I-4 through Sanford. Three routes to I-4. West. Inland. Away from the coast. Away from the storm. Not back onto 44.
This is not about building something new on a whim. The county has known about this for decades. In the mid 1990s they posted a sign near 95 and 442 that said "westward we will go." They never did it. The Farmton Local Plan adopted in 2011 includes a Spine Transportation Network with proposed road corridors through the Farmton property. The framework for this road already exists on paper. It has just never been studied.
What I hear most and the facts behind each one:
"A road brings more building." The land west of 442 is under 46,000 acres of permanent conservation easements. It cannot be developed. There is nothing to open up.
"Flooding." Any road must pass a full environmental study and a St. Johns River Water Management District permit. By law it cannot make flooding worse.
"Orlando beach traffic." They already have 44 and 46 to the beach. A road from 442 to 415 takes them out of their way. This is not a shortcut to anywhere for Orlando.
"They will take people's land." The land is privately owned tree farm, not neighborhoods. Florida law requires full compensation including legal fees.
"Just widen 442." Widening 442 still dumps everyone onto the same few roads at each end. You need a second way out, not a wider funnel into the same bottleneck.
"Just use 44." 44 is already a nightmare. New Smyrna Beach is sprawling in every direction and everything west on 44 is growing with it. Sending more traffic onto a road that is already over capacity is not a plan. It is surrender.
"Maytown Road already goes west." Have you actually driven Maytown? It starts in Oak Hill, over 10 miles south of 442. Nobody in Edgewater is driving 10 miles south to go west. It is a backwoods two lane road that winds in almost every direction on a compass. The drainage is a disaster. There is nowhere for the water to go. The ditches along Maytown are almost always full of water as it is. On a normal day. Now picture that road during a hurricane or tropical storm when it is actually raining. Maytown itself is a flood hazard. The road that people want to call an evacuation route floods before the emergency even starts. There is zero cell phone service on most of that stretch. No gas stations. No services of any kind. If you break down, run out of fuel, get stuck in standing water, or have a medical emergency during an evacuation, you cannot call 911. You cannot call anyone. You are stranded on a flooding, unlit, two lane backroad in the middle of nowhere with no way to get help and no one coming to find you. Anyone who thinks Maytown Road is a realistic evacuation route for Edgewater has either never driven it or has suffered several traumatic brain injuries that prevent them from understanding what they are looking at. That is not an evacuation route. That is where you go to die in the dark with no cell signal while the water rises around your car.
"It will flood 415 with traffic." A study does not just drop a road on 415 and walk away. It evaluates what improvements are needed on every road involved. If 415 needs upgrades, the study identifies that. Ignoring the problem does not make 415 better.
"The study was already done." No it was not. The VFTPO System Reliever Evaluation from April 2025 lists potential corridors for future study. The SR 442 to SR 415 connection is not included. The SR 417 Extension Study from the early 2000s examined a completely different road for a completely different purpose. No study of this connection has ever been done.
"Conservation agreements prohibit roads." No they do not. SR 44 crosses conservation land. SR 46 crosses conservation land. The Farmton Local Plan itself includes proposed road corridors through the conservation area. Conservation easements restrict development. They do not prohibit roads.
"Not yet." The homes arrive in 2027. Roads take years to study, plan, and build. "Not yet" is already late.
"It will never happen." They said the same thing about the sign they posted in the 1990s. The difference is that now there is a petition, community support, and officials are in the conversation. Things happen when people push for them.
"The petition promotes growth." The petition does not create a single home. The development is already approved. Already permitted. Already under construction. The petition asks for a road so the people already here and the people coming are not trapped on the coast when a storm hits.
"Just leave earlier." Tell that to the 44 people who died when Andrew hit. Tell that to every family with kids, elderly parents, or pets who need time to pack and go. "Just leave earlier" is not an evacuation plan for a city. It is advice for one person going to the airport.
Deering Park is coming either way. We can refuse to let it bury us in traffic. Study this road before the traffic shows up, not after.
Sign it: c.org/mMsVkpZJ5Z Then comment "Signed" so your neighbors know they are not alone.
Sources:
Hurricane Andrew. NOAA/NWS. Category 5, landfall near Homestead FL, August 24, 1992. weather.gov/news/220822-hurricane-andrews
Edgewater population: 23,314. U.S. Census Bureau, American Community Survey 5-Year Estimates (2019-2023).
Deering Park permitted for up to 4,692 dwelling units. farmtontreefarm.com/view-news.html?id=24
ITE trip generation rate: 9.44 daily vehicle trips per dwelling unit. Institute of Transportation Engineers, Trip Generation Manual, 11th Edition, Land Use Code 210.
Farmton Local Plan: up to 23,100 residential units and 4.7 million sq ft commercial in Volusia County. farmtontreefarm.com/view-news.html?id=25
Conservation easements: 46,000+ acres permanent as of February 2025. farmtontreefarm.com/environmental-stewardship.html
Farmton total acreage: approximately 70,000 acres in Volusia and Brevard counties. farmtontreefarm.com/faq.html
Farmton Local Plan Spine Transportation Network with proposed road corridors. Volusia County Ordinance 2011-10, Exhibit C. volusia.org/core/fileparse.php/5525/urlt/2-Executed-Ordinance-2011-10.pdf
Farmton Conservation Management Plan. Volusia County Ordinance 2013-07. volusia.org/core/fileparse.php/4407/urlt/Farmton_CMP_w-appendices2.pdf
Infrastructure neutrality: developers pay for required infrastructure. Farmton Local Plan, Ordinance 2009-34 and 2011-10.
Deering Park groundbreaking April 17, 2025. farmtontreefarm.com/view-news.html?id=32
VFTPO System Reliever Evaluation, April 7, 2025. SR 442 to SR 415 connection is not included. r2ctpo.org/wp-content/uploads/VF2050_System-Reliever-Evaluation_2025.04.07.pdf
SR 417 Extension Study. Florida Turnpike Enterprise, early 2000s. Different road, different purpose.