The Issue
We the undersigned residents call for PSE to conduct feasibility studies into undergrounding electric distribution lines on our Island. We call on administrators/representatives to support Island requests.
Undergrounding /on-grounding (GLDS) is an important opportunity to overcome key issues facing our community:
- NO PSPS (Public Safety Power Shutoffs -'blackouts') affecting business, water supply and medical equipment - such announced by PSE for this summer
- 99% wildfire ignition risk reduction
- NO trees/vegetation trimmed or cut, streetscapes and property values/building rights are left intact
- NO PSE easement acquisition or eminent domain proceedings -lines left on the Right of Way (ROW)
- NO Asplundh crews and tree specialists being paid for extensive regular & costly ongoing maintenance
- Retaining our significant established trees as an important 'decarbonization' strategy
- Earthquake preparedness
- Climate change mitigation (e.g. undergrounding is supported by Dept. of Energy). DOE $34m in UG grants
PG&E California reduced wildfire risk by undergrounding at “the lowest long term cost to customers".
“99% reduction in ignition risk at locations with lines undergrounded. This makes it one of the most effective ways to reduce wildfire risk at the lowest long-term cost to customers.” PGE UG Factsheet PGE: Neither Overhead nor Underground
478
The Issue
We the undersigned residents call for PSE to conduct feasibility studies into undergrounding electric distribution lines on our Island. We call on administrators/representatives to support Island requests.
Undergrounding /on-grounding (GLDS) is an important opportunity to overcome key issues facing our community:
- NO PSPS (Public Safety Power Shutoffs -'blackouts') affecting business, water supply and medical equipment - such announced by PSE for this summer
- 99% wildfire ignition risk reduction
- NO trees/vegetation trimmed or cut, streetscapes and property values/building rights are left intact
- NO PSE easement acquisition or eminent domain proceedings -lines left on the Right of Way (ROW)
- NO Asplundh crews and tree specialists being paid for extensive regular & costly ongoing maintenance
- Retaining our significant established trees as an important 'decarbonization' strategy
- Earthquake preparedness
- Climate change mitigation (e.g. undergrounding is supported by Dept. of Energy). DOE $34m in UG grants
PG&E California reduced wildfire risk by undergrounding at “the lowest long term cost to customers".
“99% reduction in ignition risk at locations with lines undergrounded. This makes it one of the most effective ways to reduce wildfire risk at the lowest long-term cost to customers.” PGE UG Factsheet PGE: Neither Overhead nor Underground