Bengaluru Deserves World-Class Power Supply - Implement Private Sector Participation in Po

17

Let’s get to 25 signatures!
Petitions with 1,000+ supporters are 5x more likely to win!

The Issue

The Problem

BESCOM's own admission: 13 minutes of daily power interruptions = 79 hours of outages per year

Delhi's Tata Power DDL: 0.98 hours of outages per year

Bengaluru's power supply is 80 times worse than Delhi's.

Real Impact on Citizens

Frequent power cuts disrupting work and daily life
Voltage fluctuations destroying refrigerators, ACs, and electronics
8+ major outage days in December 2025 alone - many lasting 6-8 hours
Electrocution deaths - BESCOM engineers facing prosecution in Whitefield
₹20,000+ crore BESCOM debt - the current model is failing.

 The Solution Exists: Delhi's PPP Model

When Tata Power took over Delhi's distribution (2002):

Before → After:

Outages: 110 hrs/year → 0.98 hrs/year (99% improvement)
Interruptions: 55/year → 1.75/year (97% improvement)
Losses: 53% → 7.79%
Technology used: Smart meters, automated fault detection, real-time monitoring, predictive maintenance

 

Why the 2022 PIL Failed

PIL WP-15147/2022 by Sri Muralidhar Rao was dismissed on a technicality (petitioner's consultancy background), not on merit. The power quality problem remains unaddressed.

 
Our Demands

Launch pilot PPP program for Bengaluru power distribution
Conduct independent power quality audits (international standards)
Study Delhi's TPDDL model for Karnataka
Publish real-time outage data by area
Set service guarantees with penalties for failures
 
Why This Matters for Bengaluru

✅ India's IT Capital - power cuts cost tech sector crores daily
✅ 3M+ work-from-home professionals depend on reliable power
✅ Global competitiveness - Fortune 500 companies expect better
✅ EV infrastructure needs dependable grid
✅ Proven reform capability - Karnataka unbundled power sector in 2002

 
Sign This Petition If You:

Experience frequent power cuts in Bengaluru
Lost appliances to voltage fluctuations
Work from home and need reliable power
Run a business affected by outages
Believe Bengaluru deserves world-class infrastructure
 
Started by: Amith Subramanian, Long-time Bengaluru Resident

References:

PIL Case WP-15147/2022
Deccan Herald: Whitefield Electrocution
Delhi PPP Success
TPDDL Performance

avatar of the starter
Amith SubramanianPetition Starter

Petition Updates