Thazhambur Petitions - No Action by Government

  1. Ottiyambakkam  Canal  Heighten and Strengthening of  Bund – No Action
  2. Thazhambur Rainwater Storm Drain Project – No Action
  3. Construction of culvert / bridge on OMR Road, near Numeric UPS Company (12.85 N, 80.22 E) / Sangeetha Hotel to carry rain water from Thazhambur area directly to Buckingham canal. – No Action
  4. Blockage of natural flow of water canal at GTK property developer (Perumbakkam) Ottiyambakkam Out Stream Problem – No Action
  5. Valvetti Lake - Drench, Strengthen and Heighten the bund – No Action
  6. Basic Amenities in Thazhambur – No Action

Remarks column removed by government, to purposely hide previous comments on 24th Dec 2021.