

Thazhambur-2021-TN Gov. - Flood Mitigation (English Version)
Documents shared for public view at https://drive.google.com/drive/folders/1QUINqcs5f88jip-iiNCXZ9exmBy_7KFl?usp=sharing
1. Ottiyambakkam Canal Bund
Heighten and Strengthening of Bund Petition (TN_PWD_CPT_P_PORTAL_19JUL21_1350294)
2. Thazhambur Rainwater Storm Drain Project
On OMR Road, near Numeric, the problem can be solved, by making Culvert or cutting OMR Road, to carry rainwater from Thazhambur to the other side of the Buckingham Canal.
3. GTK wall Closure Ottiyambakkam Out Stream Problem
Make a 25 feet wide concrete channel in the GTK layout, with good depth to carry excess rain water from the causeway Karanai dam.
4. Thazhambur Lake Opening to let overflow stored water
Thazhambur Lake is now overflowing with rain water.
It should be channelized through the pipes and channels, to prevent damage to people’s property and personnel.
5. Thazhambur-Semmencheri Canal Problem
The existing earthen canal should be widened
The above will solve rain storm problems of Thazhambur, Ottiyambakkam, DLF, Military Quarters, ETA, Tsunami Colony and Housing Board people.