TONIGHT!!! - Plan Commission Meeting May 7th, 2026 @ 6:30PM - Hobart City Court at the PCC Building, 705 E. 4th Street
Link to Official Petition: https://www.jtnwi.org/hobart-vote-no
Amazon’s proposed Hobart Tech Park is a major industrial development that will profoundly impact our community. The current plans - PC 26-12 (Hobart Owner, LLC) and PC 26-14 (Tuhaus, LLC) - include approximately 6 buildings on 178 acres plus 20 buildings on 605 acres, totaling roughly 26 buildings across more than 700 acres. This campus is proposed directly next to residential neighborhoods, a thriving wetlands habitat, and nearby floodplain systems.
Our community already faces serious, unresolved concerns posed by this data center development:
- Potential harm to wetlands, floodplains, and natural drainage from mass grading across hundreds of acres
- Changes to groundwater movement and possible dewatering during construction
- Risks to soil stability from large-scale grading and engineered fill
- Incomplete evaluation of hydrologic and ecological impacts next to homes
- Cumulative environmental burden of an industrial campus of this scale, sited adjacent to residential areas
- The ethical failure of approving a project of this magnitude without an independent environmental or health impact assessment
Please sign petition and attend meeting tonight at 6:30PM
Thank you!
No Data Center Group