⏳ 4 days LEFT — Have You Taken the Barnes Park Pool Survey ?


The City of Monterey Park survey on the future of Barnes Park Pool closes February 17, 2026.
🔗 Take the survey now:
BARNES PARK POOL CONCEPTUAL DESIGN SURVEY
https://www.surveymonkey.com/r/Y6YV3TS
https://www.surveymonkey.com/r/qr_code/Y6YV3TS
🟩 Why Support Option B?
Option B is the only design that preserves a full 50-meter competition pool while still providing a separate recreation pool.
It is recommended by:
• Coach Ish,• Coach Li, Coach David, Water Aerobics members, Swim Community
Why it matters:
• A 50-meter pool is irreversible — once lost, it cannot be added back
• It supports community recreation programs, seniors, therapy, and water aerobics
• It protects the historic swim legacy of Mark Keppel High School
• It supports CIF-compliant swimming, water polo, and diving programs
• Recreation elements can be expanded later — core infrastructure cannot
📣 When You Take the Survey:
✔ Select Option B
✔ Share the link with swimmers, parents, alumni, and neighbors
✔ Add this comment:
“Please support Option B with full incorporation of water polo and diving features consistent with the adopted User Requirement Specification (URS) Rev. 3a.”