Mise à jour sur la pétitionStart Construction of Kalabagh Dam for Prosperity of PakistanWhy Kalabagh Dam Before Diamer Bhasha Dam (Part II)
Azhar PanniIslamabad, Pakistan
25 Jul 2016
Comparison between Kalabagh Dam and Diamer Dam is redrafted. Comparison {Kalabagh Dam} [Diamer Bhasha Dam] -- Project Features -- 1. Type of Dam= {Earth fill Embankment} [Roller Compacted Concrete] 2. Est. Cost = {$ 6.1 billion} [$ 12.6 billion] 3. Const. Period = {5-7 years} [8-10 years] 4. Length/Height = {3350 m / 79 m} [1169 m / 272 m] 5. Live Storage = {6.1 MAF} [6.4 MAF] 6. Catchment Area = {286,100 sq.km} [95,000 sq.km] 7. Avg. Ann. Run-of = {90 MAF} [50 MAF] 8. Prox to Fault Line= {NONE} [YES] 9. Generating Capacity= {3,600 MW (Expandable)} [4,500 MW] 10. Annual Energy = {11,400 million units} [18,000 million units] 11. Transmission Voltage = {220/500 kV} [760 kV] 12. Transmission Losses = {Reasonable} [Highest] 13. Interconnection Terrain= {Plane Lands} [Most difficult (+4000 m)] 14. Proximity to Load Cntr. = {YES} [NO (+750 km far)] -- Benefits to Provinces -- 1. Water for Irrigation = {All Provinces} [Not for KP] 2. Hydel Profit = {KP* + Punjab} [KP + Northern Areas] 3. Flood Control= {KP + Punjab + Sindh} [Minimal (upto Tarbela Dam)] (* With minor realistic modification in Art. 161 (2) of Cost. of Pakistan.) > Kalabagh Dam is better than Diamer Bhasha Dam in most of features
Soutenir maintenant
Signez cette pétition
Copier le lien
WhatsApp
Facebook
Nextdoor
E-mail
X