
Bike NassauNassau County, NY, Estados Unidos
12 de ago. de 2025
First of all thank you for all support and to everyone who shared this petition!
I had a chance to speak with the assistant director of traffic engineering and I was told that the traffic study request was now in "final review" and the results should be released within a few weeks.
I'm a little confused since I was consistently being told it wouldn't be done until the fall. To hear it was suddenly initiated and completed is interesting.
Once I hear back with the results of the study I'll update.
Best
Apoie já
Assinar este abaixo-assinado
Copiar link
WhatsApp
Facebook
Nextdoor
E-mail
X