Good Morning Fellow Residents, Commuters and Petition Supporters
Work is progressing on the Multi Level Carparks as we get closer to the middle of 2021 and the announced completion dates.
Edmondson Park - Upcoming construction work for April 2021
During April, the following work will occur on the new multi-storey car park:
• Continuation of concrete pours for the suspended concrete slabs for levels three and four
• Construction of load bearing walls and columns
• Construction of stair and lift cores through the building
• Installation of perimeter scaffold on levels three and four
• Plumbing and electrical work
Leppington – No Update for April Issued to date
Construction Work continues no specific provided
ONE REPLY RECEIVED to my email
Hi Michael,
Keep up the good work. As you know we believe the Leppington proposal should be the preferred route.
Regards
Rod Roberts MLC – One Nation
No other replies have been received to my email sent on the 14th March 2021 from either the Liberal or Labor Party politicians.
EXTEND THE SOUTH WEST RAIL LINE
Watch and Share the video in the update using the link
https://www.youtube.com/watch?v=NRt3p5gS0s4
YOUR Help and assistance is still required to keep the call to Extend the Southwest rail Link from Leppington to the new Western Sydney Airport is required.
Please email me IF you can assist by getting additional signatures. Please email me for Signature Sheets
EMAIL Michael.independent1@gmail.com
OR DOWNLOAD A COPY OF THE “EXTEND THE SOUTH WEST RAIL LINK PAPER PETITION”
A link to a PDF of the Paper Petition to Extend the South West Rail Link from Leppington Station to the new Western Sydney Airport. You can print off a copy or copies and collect signatures then mail them to me at me PO Box 645 Hoxton Park 2171 which is on the bottom of the form.
I hope to see you back out on the Station Platforms SOON.
Yours Sincerely
Michael Andjelkovic JP
Independent Community Campaigner for Liverpool