Cedar Meadows Equestrian Opposition to Central's Transmission Line Routes JJ, AA, and Z

The Issue

I am 100% OPPOSED to Central Electric Power Cooperative, Inc’s (CEPCI) proposed routes JJ, AA, and Z through Aiken, SC as referenced on their Windsor-New Ellenton Study Map dated 07/17/2023, for the construction of 115kV Transmission Power Lines and Towers ANYWHERE NEAR or THROUGH CEDAR MEADOWS EQUESTRIAN and surrounding areas.

Aiken's Promise / Aiken's Threat:
We chose Aiken, South Carolina because it was a great, healthy place to raise our animals and live in a scenic, peaceful rural area. The CEPCI project is not conducive to the equestrian paradise the City of Aiken portrays on its tourism website. These 115kV Transmission Line Towers are an UNSIGHTLY EYESORE, are NOISY, and do not belong in an area comprised of BEAUTIFUL EQUESTRIAN PROPERTIES AND HOMES.

Reference material: https://cepci.org/WindsorNewEllenton

28

The Issue

I am 100% OPPOSED to Central Electric Power Cooperative, Inc’s (CEPCI) proposed routes JJ, AA, and Z through Aiken, SC as referenced on their Windsor-New Ellenton Study Map dated 07/17/2023, for the construction of 115kV Transmission Power Lines and Towers ANYWHERE NEAR or THROUGH CEDAR MEADOWS EQUESTRIAN and surrounding areas.

Aiken's Promise / Aiken's Threat:
We chose Aiken, South Carolina because it was a great, healthy place to raise our animals and live in a scenic, peaceful rural area. The CEPCI project is not conducive to the equestrian paradise the City of Aiken portrays on its tourism website. These 115kV Transmission Line Towers are an UNSIGHTLY EYESORE, are NOISY, and do not belong in an area comprised of BEAUTIFUL EQUESTRIAN PROPERTIES AND HOMES.

Reference material: https://cepci.org/WindsorNewEllenton

The Decision Makers

Central (CEPCI)
Central (CEPCI)

Petition Updates