Bring Namma Metro to Kaniminike: Build a Multimodal Transport Hub for Southwest Bengaluru

331

Let’s get to 500 signatures!
Petitions with 1,000+ supporters are 5x more likely to win!

The Issue

To,
The Managing Director
Bangalore Metro Rail Corporation Limited (BMRCL)
Bengaluru, Karnataka 560027

Subject: Re Proposed Purple Line Extension (Challaghatta–Bidadi): Request to Consider a Metro Station at Kaniminike, Align it with BDA's Proposed Direct Approach Road, and Integrate Multimodal Connectivity in the Feasibility Study

Respected Sir,

We, the residents of Kaniminike and neighbouring villages, wish to draw your attention to an important opportunity to improve public transport connectivity in the rapidly developing southwestern corridor of Bengaluru.

With BMRCL examining the proposed extension of the Purple Line from Challaghatta towards Bidadi, we request the Corporation to consider a strategically located Metro station at Kaniminike, aligned with the direct approach road being developed by the Bangalore Development Authority (BDA).

Kaniminike and its surrounding areas are rapidly emerging as a major residential and institutional growth corridor. The region encompasses several villages, growing residential layouts, apartment complexes, educational institutions and industrial establishments. The BDA Kaniminike Housing Project alone comprises approximately 1,500 existing residential units, with another approximately 1,500 units coming up. Several private residential developments are also emerging across the surrounding areas.

The presence of educational institutions, including Christ University, Don Bosco Institute of Technology and Rajarajeshwari College of Engineering, along with the industrial establishments in Kumbalagodu and the wider Bidadi belt, will further contribute to daily commuter movement. This makes it important for BMRCL to consider the region's future population and mobility requirements while determining the metro alignment and station locations.

An important opportunity exists to integrate the proposed metro station with BDA's direct approach road. Residents of Kaniminike and neighbouring villages have faced long-standing connectivity challenges, further compounded by inadequate integration of local access roads with the Bengaluru–Mysuru Expressway. BDA has now initiated steps towards developing a direct approach road to its Kaniminike housing project. We request BMRCL to coordinate with BDA and examine the possibility of locating the metro station at or near this proposed road connection, ensuring convenient access for the wider catchment.

Further, a proposed railway halt station by South Western Railway at Kaniminike presents an opportunity to develop this location as a multimodal transport interchange. We request BMRCL to explore coordinated planning with South Western Railway, BDA and BMTC to integrate:

  • Namma Metro connectivity along the proposed Challaghatta–Bidadi extension.
  • The proposed Kaniminike railway halt station.
  • BMTC bus services and feeder routes connecting surrounding villages and residential layouts.
  • BDA's proposed direct approach road, along with pedestrian, cycling and last-mile connectivity facilities.

We would also like to highlight that BDA's Draft Revised Master Plan 2031 had identified Kaniminike and Kumbalagodu for proposed metro connectivity, reinforcing the importance of this region in Bengaluru's long-term transport planning.

In this regard, we request BMRCL to:

  • Consider a Metro station at Kaniminike while finalising the proposed Challaghatta–Bidadi extension.
  • Explore aligning the station with BDA's proposed direct approach road.
    Initiate consultations with BDA, South Western Railway and BMTC to assess the feasibility of an integrated multimodal transport hub.
  • Consider the projected population growth and commuter demand across the surrounding villages, residential developments, educational institutions and industrial establishments.
  • The Bengaluru–Mysuru Expressway has demonstrated how inadequate integration of major infrastructure with local connectivity can create long-term difficulties for surrounding communities. We have an opportunity to avoid repeating these shortcomings while planning the next phase of metro expansion.

We urge BMRCL to look at the larger regional mobility requirements and plan this infrastructure in a way that serves both existing communities and the future growth of southwestern Bengaluru.

We request an opportunity for residents' representatives to meet the concerned officials and present this proposal.

Thank you.

Yours faithfully,

Residents of BDA Kaniminike Housing Projects and nearby villages & Layouts

BDA Kaniminike Residents ForumPetition StarterBDA Kaniminike Residents Forum is a community of volunteers and like-minded residents of BDA Kaniminike Apartments working together for the larger cause of civic development, public safety, infrastructure improvement, and community welfare in Kaniminike.

The Decision Makers

BMRCL - Namma Metro
Bangalore Metro Rail Corporation Limited (BMRCL)

Petition Updates