Petition updateStop the demolition of Cuttagee Bridge and its replacement with a concrete structure

Designs ready for public viewing on Sept 8th for 29 days

Karen JoynesAustralia
Aug 24, 2025

Hello Cuttagee Bridge Supporters,

Last week, Bega Valley Shire Council resolved to place the 3 bridge design options on public display on 8 September for comments over 29 days. Item 9.4 https://begavalley.infocouncil.biz/Open/2025/08/OC_20082025_MIN_1078_WEB.htm

Worryingly, it seems the design engineers have not heeded the results of the Have Your Say where 70% of respondents wanted  a mainly timber single lane bridge. It seems the closest is a single lane hybrid design mainly concrete and steel with just decorative timber.  It is to be constructed to take 44.5 tonnes, according to information from Bermagui Community Forum - https://www.facebook.com/bermaguiforum - yet Wallaga Lake Bridge load is 22.5 tonnes.

Please keep an eye out for the bridge designs and make your preference known.

Copy link
WhatsApp
Facebook
Nextdoor
Email
X