Atualização do abaixo-assinadoUrge TFL To Reduce Train Noise

TfL Admits 9 Grinding Sessions & Speed Restrictions — Yet the Severe Noise Continues

Bruce GibsonLondon, ENG, Reino Unido
25 de nov. de 2026

Dear Supporters,

I wanted to share an important update regarding our campaign against the severe Jubilee line noise and vibration affecting the Marylebone and Balcombe Street area.

Following escalation through the Leader of Westminster City Council, Councillor Paul Swaddle, Transport for London (TfL) has finally provided an operational update. In their response, TfL confirmed that between April and July 2026 they carried out nine separate rail-grinding interventions across both the northbound and southbound lines, and introduced a "variable speed restriction" in the area.

However, as everyone living and working above this stretch of track knows firsthand, these measures have made no discernible difference whatsoever. The severe, deep-tube rumble and structural vibration continue day and night.

Why Radical Engineering Changes Are Now Essential

TfL's latest response proves what we have argued from the beginning:

  • Cyclical Grinding Does Not Last: Even after nine separate grinding sessions in four months, heavy train frequencies and axle loads cause rail corrugation and severe noise to return rapidly.
  • Token Speed Restrictions Are Not Enough: Whatever "variable speed restriction" TfL claims to have introduced has failed to reduce ground-borne noise to tolerable levels.
  • Refusal to Modernise Track Infrastructure: TfL has stated they will only install resilient, noise-dampening track fixings when track requires full renewal for safety reasons—refusing to upgrade the track mountings to protect residents' health, sleep, and property values.


Next Steps & How You Can Help

We are pressing TfL on two separate political fronts. Alongside our formal pushback through Westminster Council, a separate department at TfL recently responded to our local MP, Rachel Blake, advising of some intended maintenance actions. We have now equipped Rachel with a comprehensive technical rebuttal so she can tackle TfL head-on at her upcoming meeting with the Deputy Mayor for Transport—demanding meaningful, permanent speed reductions along the Baker Street to St John's Wood curve and a firm timeline for resilient track-mounting upgrades or tuned mass dampers.

With nearly 600 local signatures, our collective voice is forcing TfL to answer for their inaction. Please continue to share our petition with neighbours, residents' associations, and local landlords so we can keep the pressure on:

👉 https://www.change.org/Train_noise_Marylebone

Thank you for your continued support