29 Nov 2017
The site plan has been updated to show the extent of this proposal. The original red line boundary covered the area around the sheds, the boundary now shows the whole industrial site.
The ground water nitrate levels were checked in 1995 and found to be 0.01mg/l of nitrate, the figures were 11.23mg/l in 2007, this was a short time after the ground was ploughed up for veg production, we now have ground water nitrate levels of 55.07mg/l, this is over the permitted allowance of 50mg/l, cant see it getting any better with chook muck on it.