Actualización de la peticiónSTOP THE BUILDING OF A GARBAGE AND MEDICAL WASTE INCINERATOR (CANCER FACTORY) IN MAGHTAB -INSIDER INFORMATION OF DECENT PROPOSALS IGNORED BY GOVERNMENT
A BonellSliema, Malta
13 may 2025

On 15th March 2001 ...Tender for Waste Management DECENT TRUSTHWORTY EXPERTS proposed to Government at teh time that incinerators are built at Mxlokk where today is the BWSC built in 2010... there for 2 reasons .....

  1. To connect the power from the two proposed incinerators to the existing power grid...was pre interconnectors... and
  2. Since there was a report some 10 years earlier commissioned to position the new 1992 Power station. The best place for a chimney stack was Mxlokk since 70% of winds in Malta are N and NW and blow offshore rather than onto central Malta ....

Fastfoward to 2025 why is Frank Bezzina of Wasteserv fucking up everything!