署名活動についてのお知らせStop All Aboard Florida from using the FEC train tracks. They should build new tracks west of our towns without the use of U.S. Government backed loans or funds.Brightline update: Stuart's $45 million Brightline Station, parking garage nixed, +TOD development
Florida NOT All AboardEast Coast, FL, アメリカ合衆国
Aug 14, 2024

*The City of Stuart and Martin County have committed $45 million to the Brightline station project, with $30 million allocated from Stuart.
*An additional $800,000 will be allocated to promote the station.
*The agreement includes an 80-year lease of the land for the station at a rate of $1 per year.
*$30,000,000 equates to each Stuart resident contributing $1,544 each to help fund the station and parking lot construction.
*Parking fees will range from $8 to $15 per day.
*Brightline requires an additional 1.6 acres and the right to develop for TOD in exchange for $1 on an 80-year lease.
*No study to substantiate any benefits.
Watch video below for details.

Commissioners up for election supporting Brightline and this station:

Becky Bruner

Ed Ciampi

Troy McDonald

Doug Smith

 

https://youtu.be/k1HkTk-LNzE?si=oIf3lm-8hkV6I22Z

声を届けよう
今すぐ賛同
リンクをコピー
WhatsApp
Facebook
Nextdoor
Eメール
X(旧:Twitter)