Request For Glasgow City Council to Share
The Scottish Government’s Digital Telecommunications: Planning Guidance (December 2023), specifically paragraphs 4.6 and 4.7, states that public compliance with ICNIRP exposure guidelines is determined by mathematical calculation and implemented through appropriate antenna positioning, access restrictions, barriers and signage where necessary.
This is particularly relevant to the proposed installation because the mast is immediately adjacent to a public walkway and within approximately 30 metres of residential properties.
Given the proximity of the installation to areas regularly accessed by members of the public, I consider it reasonable to establish what site-specific assessment has been undertaken to demonstrate compliance with the relevant public exposure guidelines.
We have therefore requested, under the Environmental Information (Scotland) Regulations 2004, copies of all environmental information held by Glasgow City Council relating to the proposed mast, including:
The complete ICNIRP declaration submitted by the operator.
Any supporting RF radiation calculations, mathematical modelling, technical assessments or exposure predictions submitted to or otherwise held by the council.
Any predicted radiation exposure levels at ground level, the adjacent public walkway and nearby residential properties.
Any recorded technical information concerning the proposed antennas, including their operating frequencies, maximum power output, mounting height, orientation, beam angles and downtilt, insofar as this information is held.
Any assessment of cumulative exposure from the proposed installation and other relevant nearby telecommunications installations.
Any correspondence between Glasgow City Council and the applicant, operator or planning agent concerning ICNIRP compliance and public exposure.
Any post-installation measurements, commissioning reports or radiation compliance assessments held by the council.
Any internal assessments or correspondence addressing public access and potential exposure in the immediate vicinity of the proposed mast.
Confirmation of whether the council has sought or received any technical evidence beyond the applicant’s self-certified ICNIRP declaration.
If the council does not hold any of the supporting technical calculations or radiation assessments, please explicitly confirm this.
Additionally we have also requested also clarification on the following:
Has the council established whether the operator has undertaken site-specific mathematical calculations to demonstrate compliance with ICNIRP public exposure limits?
Has the council considered the proximity of the mast to the public walkway and neighbouring residential properties when considering the potential for public exposure?
Has the council established whether any areas around the installation would require access restrictions, barriers or warning signage to maintain compliance with public exposure guidelines?
Response from GCC is pending