Time to make a PERMANENT change to Highway 37/suicide hill!

The Issue

Suicide Hill on Highway 37, between Kitimat and Terrace, has always been a very noticeable driving hazard. Winter 2016/17 there were 5 accidents in this particular area. 1 being fatal.  

It is clear that "band-aid" fixes aren't our best option. These temporary patches do NOT change the fact that it isn't banked correctly.  It doesn't take a rocket scientist to physically FEEL the constant slope changes, despite the recent resurfacing.  I feel like money is being wasted going into temporary fixes, instead of a permanent solution.   

Physically noticeable observations on suicide hill include, but are not limited to:

  • Three major stress points, where potholes end up recurring EVERY year.
  • Four different slope percentages; coming down it starts around 5% around the first corner, then drops to 6% at the first pothole, with pothole dipping dangerously towards the right. The second pothole is a slope of 7% with a pull to the left... then the slope drops to almost 8% after the third pothole, which causes major wheel-hop to the left. STILL very steep to the bottom corner, and just as you think you've passed the apex, the corner turns a harder right. This is a recipe for disaster, and as previously mentioned it doesn't take a rocket scientist to realize this is a major hazard. 

The speed limits were recently reduced from 80km to 60km going down. Clearly RoadSafe BC realizes this hill is a hazard. Instead of trying to fix the "symptoms" and adding a "band-aid" let's solve this problem by fixing the ROOT cause.  
BANK SUICIDE HILL(Highway37ServiceArea26Skeena) PROPERLY! 

This petition had 2,118 supporters

The Issue

Suicide Hill on Highway 37, between Kitimat and Terrace, has always been a very noticeable driving hazard. Winter 2016/17 there were 5 accidents in this particular area. 1 being fatal.  

It is clear that "band-aid" fixes aren't our best option. These temporary patches do NOT change the fact that it isn't banked correctly.  It doesn't take a rocket scientist to physically FEEL the constant slope changes, despite the recent resurfacing.  I feel like money is being wasted going into temporary fixes, instead of a permanent solution.   

Physically noticeable observations on suicide hill include, but are not limited to:

  • Three major stress points, where potholes end up recurring EVERY year.
  • Four different slope percentages; coming down it starts around 5% around the first corner, then drops to 6% at the first pothole, with pothole dipping dangerously towards the right. The second pothole is a slope of 7% with a pull to the left... then the slope drops to almost 8% after the third pothole, which causes major wheel-hop to the left. STILL very steep to the bottom corner, and just as you think you've passed the apex, the corner turns a harder right. This is a recipe for disaster, and as previously mentioned it doesn't take a rocket scientist to realize this is a major hazard. 

The speed limits were recently reduced from 80km to 60km going down. Clearly RoadSafe BC realizes this hill is a hazard. Instead of trying to fix the "symptoms" and adding a "band-aid" let's solve this problem by fixing the ROOT cause.  
BANK SUICIDE HILL(Highway37ServiceArea26Skeena) PROPERLY! 

The Decision Makers

Service area 26 - Skeena
Service area 26 - Skeena
RoadSafeBC
RoadSafeBC

Petition Updates

Share this petition

Petition created on 5 October 2017