Aggiornamento sulla petizioneOpen up the grid to small suppliers of renewable energy.AEMO is waking up to the huge capacity of micro power.
simon HuntElwood, Australia
7 mag 2024

 https://ieefa.org/articles/aemo-needs-greater-ambition-der-true-whole-system-isp?utm_campaign=Weekly%20Newsletter&utm_medium=email&_hsmi=305548844&utm_content=305548844&utm_source=hs_email
 


Electric Grid Electric Vehicles Energy Policy Australia
AEMO needs greater ambition on DER for a true whole-of-system ISP
May 01, 2024
  � �
  
Key Takeaways:
Distributed energy resources (DER) in homes and businesses will likely be the largest component of generation capacity, storage and flexible load in the National Electricity Market (NEM) by 2050.

 � � �
The Australian Energy Market Operator’s DER forecasts are conservative in several respects, meaning DER could play a much greater role than currently forecast.

 � � �
A higher DER sensitivity is needed in the 2024 Integrated System Plan (ISP), and a high DER scenario is required in the 2026 ISP.

 � � �
Australia’s energy transition could end up slower and more expensive