Fill Suez Canal with Flex Seal™

The Issue

 The Suez Canal is an artificial sea-level waterway in Egypt, connecting the Mediterranean Sea to the Red Sea through the Isthmus of Suez. Constructed by the Suez Canal Company between 1859 and 1869, it was officially opened on November 17, 1872. 

 THIS MUST CHANGE, Suez Canal, 1872 - 2022-23

 With the assistance of President Donald Trump, we should be able to get this done on the double, i'm thinking before June of 2022 as long as everything goes to plan, which brings me to my next point

 THE FOUR YEAR PLAN™

 The Four Year Plan Involves President Donald J. Trump finishing his Southern Border wall by May of 2018, It may not seem possible but as of right now if we get to work on it, we can get it up to 3 feet by then, which is good enough as long as we set up Guard dogs/dog at the border to scare away the immigrants.

 Next the purchasing and transportation of Materials, Flex Seal, Small amount of Flex Tape, and the workers, all transported from the wall.

Construction should start between 2019 to 2020, With no winter delays the project should be half complete by 2021, following up with a complete drainage and filling by summer of 2022

Finally The Complete Sea Walling and embargoing of all Mediterranean countries, Following with prompt Annexation by all Western European Countries,.

This petition had 66 supporters

The Issue

 The Suez Canal is an artificial sea-level waterway in Egypt, connecting the Mediterranean Sea to the Red Sea through the Isthmus of Suez. Constructed by the Suez Canal Company between 1859 and 1869, it was officially opened on November 17, 1872. 

 THIS MUST CHANGE, Suez Canal, 1872 - 2022-23

 With the assistance of President Donald Trump, we should be able to get this done on the double, i'm thinking before June of 2022 as long as everything goes to plan, which brings me to my next point

 THE FOUR YEAR PLAN™

 The Four Year Plan Involves President Donald J. Trump finishing his Southern Border wall by May of 2018, It may not seem possible but as of right now if we get to work on it, we can get it up to 3 feet by then, which is good enough as long as we set up Guard dogs/dog at the border to scare away the immigrants.

 Next the purchasing and transportation of Materials, Flex Seal, Small amount of Flex Tape, and the workers, all transported from the wall.

Construction should start between 2019 to 2020, With no winter delays the project should be half complete by 2021, following up with a complete drainage and filling by summer of 2022

Finally The Complete Sea Walling and embargoing of all Mediterranean countries, Following with prompt Annexation by all Western European Countries,.

Petition Closed

This petition had 66 supporters

Share this petition

The Decision Makers

Donald J. Trump
Former President of the United States
Petition updates
Share this petition
Petition created on March 15, 2018