The Commission voted no, 0 to 3. The testing request now goes to the State.
Thank you for signing. Here is what happened, and what comes next.
On Wednesday, November 18, the Wyandotte Municipal Services Commission voted on my request for a GLWA feasibility study. It failed, 0 to 3. Two commissioners were excused. A resident's request for testing failed the same way. My written statement was read into the record in full.
Two things were said on the record. First, that a study is unnecessary because connecting to the Detroit system is feasible. Second, that the Commission has no authority over BASF, and that enforcement belongs to the State and EPA.
So the testing request now goes to the State. BASF's own design report lists what is in the groundwater at North Works. Some of those chemicals, including phenol and vanadium, do not appear in any lab report the State has posted for Wyandotte's water from 2021 through the third quarter of 2026. The tests exist. EPA's own records show Wyandotte's water was tested for vanadium in 2013 and 2014, under a federal monitoring rule.
I have asked three of our state legislators to ask EGLE to test Wyandotte's raw and finished water for those chemicals, post the results, and have BASF pay. Not Wyandotte residents. A fourth gets the same letter Monday. I asked each for an answer by December 4.
The State also told the City to submit a reliability study by December 31, 2026. I will read it and report back here.
I am not saying the water is unsafe. I am saying we deserve the full picture.
What you can do: share this petition with one neighbor. Every signature shows the State that people are watching.
The river keeps moving. So do we.
Sergeant Brian Burgess, U.S. Army, Ret.
Wyandotte, Michigan