A correction, and Wednesday's vote in Wyandotte
Neighbors, thank you. 3,580 of you have signed for the river that raised us.
First, a correction. I wrote here that EPA's May 19, 2026 deadline for BASF's cleanup design passed in silence. That was wrong. BASF submitted the design that day, and EPA approved it on June 29. Construction is planned for early 2027. I fixed the petition tonight.
The approval is not the finish line. A design on paper does not stop the water. Until the barrier is built and working, groundwater from North Works keeps reaching the river, and the State told BASF in writing in March 2025 that it is not meeting the 1986 consent decree.
I correct my own mistakes in the open. That is how you know you can trust the rest.
Now the part where you can help this week.
This Wednesday, November 18, at 5 PM, the Wyandotte Municipal Service Commission meets at City Hall, 3200 Biddle Avenue. On the agenda: a resident request to ask the Great Lakes Water Authority for a feasibility study, share the plan if a spill closes the city's drinking water intake, and have BASF, not ratepayers, pay for added testing. A neighbor's request for more thorough testing is on the agenda too.
If you live in Wyandotte, two lines by email count. Send them before Wednesday to the General Manager, plamanes@wyandottemi.gov, and copy the City Clerk, clerk@wyandottemi.gov. Ask that your words be entered in the record.
If you live anywhere else on this river, share this with someone in Wyandotte.
I am not saying the city's treated water is unsafe. The State's posted reports show nothing over a legal limit, and I thank the people at our plant. This is about the river, a cleanup order that is not being met, and a plan if something goes wrong.
The river is ours. Let's look after it together.
Sergeant Brian Burgess, U.S. Army, Ret.
CBRN Specialist
Wyandotte, Michigan