

DART+ Coastal North: Changes to Howth Dart route
La causa
The plan to reduce the frequency and introduce a transfer to a shuttle at Howth Junction station is a direct contradiction of several of the National Transport Authority's own heavily funded projects including:
- the Green School Initiative whose aim for decades was to reduce the congestion caused by students traveling to school by car. The changes proposed will drive an increase in children being dropped to the school gate.
- the Safe Routes to School Initiative which invested in “front of school” treatments that enhanced access to school grounds and created a safe space for students at the front of school. The drop-off points designed at schools will become over-whelmed and unsafe as students switch to commuting by car.
It also goes directly against a key recommendation made in the OECD and the Irish Climate Change Advisory Council report, ' Redesigning Ireland's Transport for Net Zero: towards systems that work for people and the planet' , to "redefine the goal of the transport system as sustainable accessibility in order to challenge ingrained mindsets and shift away from identifying high mobility, in terms of reduced travel time, with well-being."
The students attending Sutton Park School, St Fintans Primary, and Santa Sabina at the moment only have access to a number 6 bus which is scheduled just once an hour. This bus service is prone to not turning up due to staff shortages at Dublin Bus. The only other access to public transport is a once-a-day service, of the 102C and 102. This is the complete public transport network available to the students. As a result, many students take a 30 minute walk to Sutton Station, to get on the DART. Subsequent to the proposed changes, these students would be expected to walk 30 minutes, or get the once-daily service to Sutton Station, then get the shuttle at peak time to Howth Junction and wait on a full platform to change to a potentially full peak time DART. This will, for sensible reasons, lead to a mindset of parents/guardians driving students to school.
This foreseeable resultant shift back to students traveling to school by private cars, will occur against the backdrop of gridlock caused by all railway crossings in the area being closed for 30 or more minutes per hour.
I object to these changes as they represent a contradiction of the NTA's own investments and initiatives. It also goes against government climate change initiatives and represents a degradation to public transport services in the area. Instead of reducing DART direct services, the plans should be to increase access to public transport through increasing public bus links to the local dart stations including:
- changing the 102 to the full 102T route with 102 existing frequency.
- increase the frequency and reliability of the number 6.

692
La causa
The plan to reduce the frequency and introduce a transfer to a shuttle at Howth Junction station is a direct contradiction of several of the National Transport Authority's own heavily funded projects including:
- the Green School Initiative whose aim for decades was to reduce the congestion caused by students traveling to school by car. The changes proposed will drive an increase in children being dropped to the school gate.
- the Safe Routes to School Initiative which invested in “front of school” treatments that enhanced access to school grounds and created a safe space for students at the front of school. The drop-off points designed at schools will become over-whelmed and unsafe as students switch to commuting by car.
It also goes directly against a key recommendation made in the OECD and the Irish Climate Change Advisory Council report, ' Redesigning Ireland's Transport for Net Zero: towards systems that work for people and the planet' , to "redefine the goal of the transport system as sustainable accessibility in order to challenge ingrained mindsets and shift away from identifying high mobility, in terms of reduced travel time, with well-being."
The students attending Sutton Park School, St Fintans Primary, and Santa Sabina at the moment only have access to a number 6 bus which is scheduled just once an hour. This bus service is prone to not turning up due to staff shortages at Dublin Bus. The only other access to public transport is a once-a-day service, of the 102C and 102. This is the complete public transport network available to the students. As a result, many students take a 30 minute walk to Sutton Station, to get on the DART. Subsequent to the proposed changes, these students would be expected to walk 30 minutes, or get the once-daily service to Sutton Station, then get the shuttle at peak time to Howth Junction and wait on a full platform to change to a potentially full peak time DART. This will, for sensible reasons, lead to a mindset of parents/guardians driving students to school.
This foreseeable resultant shift back to students traveling to school by private cars, will occur against the backdrop of gridlock caused by all railway crossings in the area being closed for 30 or more minutes per hour.
I object to these changes as they represent a contradiction of the NTA's own investments and initiatives. It also goes against government climate change initiatives and represents a degradation to public transport services in the area. Instead of reducing DART direct services, the plans should be to increase access to public transport through increasing public bus links to the local dart stations including:
- changing the 102 to the full 102T route with 102 existing frequency.
- increase the frequency and reliability of the number 6.

Actualizaciones de la petición
Compartir esta petición
Petición creada en 3 de septiembre de 2024