
Barry HolizkiCalgary, Canada
Apr 18, 2016
The Calgary Planning work is not complete because the 2011-08 SWBRT Functional Study SCOPE EXCLUDED the traffic issues at the 14 St SW and Crowchild interchanges with Glenmore Trail. A High Pressure Gas Pipeline Encountered under Proposed Bus Route. Let us be heard.