
Did you know with no trees, the world will heat up and dry leading to worldwide famine?
From NEMT-PSBA-Exhibit-E.pdf page 3
The proposed new school for Northeast Metro Tech will be a large-scale intervention in the wooded hillside adjacent to Breakheart Reservation. The site clearing and blasting necessary to create the buildable area makes it difficult to hide the size or scale of the new school.
From the Preferred Solution Narrative 01/2021
The C.3 option sites the new building on the undeveloped hillside area south of the existing school. This area is wooded with a significant amount of ledge outcroppings. The proposal calls for the creation of a flat building pad through a mass tree-clearing and blasting operation in an early site enabling phase.