Actualización sobre la peticiónAccelerate MRT plans for Singapore’s west by 2035Share the petition to accelerate MRT solutions for the west
Anon SGSingapur
10 jun 2025
Hi everyone, thanks for signing our petition so far!
Share the link with other citizens
For our petition to become effective, please help to share it with as many people as possible! (https://www.change.org/p/accelerate-mrt-plans-for-singapore-s-west-by-2035/
Share the summary of actions with the authorities
Feel free to share our proposals with the authorities, through legitimate feedback channels. You can use the summary below:
- Mr Jeffrey Siow’s Facebook page - https://www.facebook.com/jeffreysiowzx
- Ministry of Transport - https://www.mot.gov.sg/contact-us/feedback-form
- Land Transport Authority - https://www.lta.gov.sg/content/ltagov/en/contact_us/contact_form.html
3 actions that we want:
- Complete the JRL's West Coast Extension line by 2030 (as MOT had originally proposed)
- Open the Tengah Line stations in the west by 2031 (e.g. in Tengah and Bukit Batok), to extend to the Greater Southern Waterfront by 2035
- Further extend the Jurong Region Line to connect to the Central Area by 2035 (e.g. interchanging at Orchard, Dhoby Ghaut, or Tanjong Pagar)
When the authorities see that more and more citizens get behind this petition, real change will happen sooner.
Apoyá la petición ahora
Firmá esta petición
Copiar enlace
WhatsApp
Facebook
Nextdoor
Email
X