The removal of Chris Grayling MP from all public service employment

0 have signed. Let’s get to 100!


Either he or the Prime Minister is ultimately responsible for the totally shambolic introduction of revised Thameslink train timetabling which has created chaos to an incredible number of peoples lives over the past 10 days. This individual has been ineffective for too long and deserves to be fired.