Rachael PhillipsBuffalo, NY, United States
May 2, 2026

Updated site plan is now available on the Town of Hamburg website at https://www.townofhamburgny.gov/651/3401-and-0-Lakeshore-Industrial-Shop-Bui

 

One major addition and concern is the 30ft wide gravel road for emergency access to utilities (Woodlawn Sewer line) via Beam Road off Nelson Ave. 

 

Legally through Erie County the access point should be Lakeshore Road, not Beam Road or Nelson Ave. 

 

Can this sewer infrastructure handle heavy trucks and equipment driving on a gravel road? Which is not ideal for heavy trucks required to fix the sewer main should damage occur. They do not distribute weight of large vehicles propertly and can cause major infrastructure damage.

 

Who will front the cost for these damages, the applicant or taxpayers? 

 

These unresolved questions could cause lasting damage to and alter our community in Woodlawn as we know it. 

 

Share the link for the petition please we need all the signatures possible by Wednesay March 6th and the Planning Board meeting at 7pm at Town Hall! 

 

Email jrogers@townofhamburgny.gov to the ATTN of the Planning Board if you oppose this project, and tell them why!

 

Sign, show up, email, make a difference! 

Copy link
WhatsApp
Facebook
Nextdoor
Email
X