Put the Ft. Pierce North Drawbridge on a scheduled basis of operation

0 have signed. Let’s get to 1,000!


This drawbridge operates on an "on-demand" basis for all vessels requesting it.  This results in long lines of vehicular traffic, unnecessary wear and tear on the mechanics of our bridge, wasted fuel and potential safety hazards for the motorists. Our bridge is the only convenient access point for the residents of North Hutchinson Island to the mainland and Ft. Pierce.  We depend on it to get to our grocers, doctors and all other needs.  In addition, vendors who provide service to the residents of our island depend on this bridge to conduct business with us.  A majority of the drawbridges operating today along the Atlantic Intracoastal Waterway are already doing so on some type of schedule.  We are asking for the same.



Today: Bob is counting on you

Bob Alton needs your help with “Rep. Brian Mast: Put the Ft. Pierce North Drawbridge on a scheduled basis of operation”. Join Bob and 582 supporters today.