Faster Construction at the NY N train 36st ave Station

0 have signed. Let’s get to 200!


Do you use the N train, but the stop you need to get off at is under construction?

Do you need to go take other ways that are not convenient to you to get to school or work because of this construction?

Do you take significantly longer to get to your destination because of this construction?

Well you're one of the many that have fallen victim to the long construction of the N train. This is specifically directed towards the 36st ave stop for:

  • The Baccalaureate School for Global Education (BSGE) is located near it where the students who attend it prefer taking the N train to this stop since its faster, more efficient, and drops them off the closest to their school
  • Not taking the N train to this stop will make you take the M or R train which will take considerably longer than taking the N train
  • BSGE kids aren't the only ones that could use this stop, but students who attend the Frank Sinatra High-school will also benefit from this
  • The construction is supposed to end next month in June, however it doesn't seem to be close to done, with a lot of work ahead planned for this station. 

This petition will help provide easier transportation for students and adults allowing them to take a faster route than take a longer one that includes delays and many transfers. 



Today: Sylvia is counting on you

Sylvia Boguniecki needs your help with “metropolitan transportation authority: Faster Construction at the NY N train 36st ave Station”. Join Sylvia and 107 supporters today.